My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
1617
>
2300 - Underground Storage Tank Program
>
PR0231923
>
COMPLIANCE INFO_2009-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2024 2:05:50 PM
Creation date
6/23/2020 6:54:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2011
RECORD_ID
PR0231923
PE
2361
FACILITY_ID
FA0003606
FACILITY_NAME
ARCO 05450
STREET_NUMBER
1617
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13511015
CURRENT_STATUS
01
SITE_LOCATION
1617 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231923_1617 W FREMONT_2009-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
363
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
by Emergency Shut-Off (ESO) Testing Results Checklist <br /> - - - _ - <br /> r 3 M.£ .,, ,1i "x . , mi � Ffo' lip" <br /> Site <br /> r �ftr�natiQ>>l % ses>u ,% 3 6 <br /> Site# 5450 Co. Name: FASTECH Date, 09/01/11 <br /> Addr. 1617W. Fremont Phone: 714-523-0194 <br /> City/St: Stockton,CA Lead Tech: Omar Ruiz ❑ PASS <br /> eMaint.W.O.# 9775929 Name: Omar Ruiz or <br /> Passport#: IB35686 ❑ FAIL(Next Day Repair Required) <br /> Signature: I ? <br /> The objective of this test is to provide assurance that when the ESO switch is activated,all the fueling system circuits(turbines,and dispensers)are de- <br /> energized,and remain de-energized until they are re-set manually. The test procedures and guidelines shall be in accordance with the ESO Testing Process. <br /> # The following information is to be completed. X To Select <br /> Yes I No INIA <br /> r <br /> 1 Number of ESO switches: 1 <br /> 2 Type of Switch E]J Push Pull Monentary ❑ Plain light/Toggle ❑ 1Cther <br /> if Momentary type,locate and identify re-set button): <br /> Type of Turbine Control Relay System(Electrical Distribution Center): <br /> ❑ Brown Box p I Power Solution ❑ Custom Fabricated ❑ Carolina Box 2 Other <br /> 4 Tye of Turbine Control Relays: Make red jacket Modef cwt <br /> 5 Type of Line Leak Detection: I] Mechanical ❑ ELD/CPT ❑ PLLD <br /> PERI+ORMaPlGE TEST <br /> 6 Does the ESO shutdown power to the DISPENSERS? Pi n <br /> 7 Does the ESO shutdown power to the TURBINES? ED ❑ <br /> Is the 220 voltage to the turbine relay removed(either the line side or the motor side of the contacts or the coil)? 21 El8 <br /> 9 Are the DISPENSER BREAKERS clearly identified/labeled? ❑ <br /> J <br /> 10 Are the TURBINE BREAKERS clearly identified/labeled? ❑ ❑ <br /> 11 Are all the ESOs accessible and clearly identified/labeled? ❑ ❑ <br /> J <br /> Did the ESO(s)function correctly(de-energized from either the line side or the motor side of the contacts or the coil)? 0 ❑ <br /> 12 <br /> If#12 is NO,briefly describe what was wrong: <br /> 12A _ <br /> How was it corrected: <br /> 12B <br /> 12C If repair or ESO functionality cannot be corrected same day(prior to leaving the site). The technician MUST not the <br /> Site Manager of the problem,place an"Out of Service"Tag on the ESO(s),and identify an alternate mean(i.e., locate <br /> circuit panel,clearly identify turbine and dispenser breakers for shut-off in the event of an ewer ency). <br /> 12D <br /> Elite Customer Solution Center has been contacted for the repair. <br /> i <br /> eMaint.W.O.Ticket# <br /> f''OS1 T " ,% <br /> , .. <br /> 11 Site's fueling system is fully operational. L51;7,1 <br /> 12 All a ui ment secured and an access orts, lids,enclosures are closed. <br /> 13 All safet barricades,and an debris was been removed. s P' <br /> .. <br /> Sutrr'it completed copy with other documentation in E-Maintenance. <br />
The URL can be used to link to this page
Your browser does not support the video tag.