My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2014-2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
1617
>
2300 - Underground Storage Tank Program
>
PR0231923
>
COMPLIANCE INFO_2014-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2024 2:13:24 PM
Creation date
6/23/2020 6:54:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2014-2017
RECORD_ID
PR0231923
PE
2361
FACILITY_ID
FA0003606
FACILITY_NAME
ARCO 05450
STREET_NUMBER
1617
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13511015
CURRENT_STATUS
01
SITE_LOCATION
1617 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\F\FREMONT\1617\PR0231923\UST RETROFIT PLAN 2014.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
444
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
bp <br />Emergency0 !` r Results & <br />Technician: Chris San Nicolas x I PASS <br />or <br />sort: =FAIL (Next Day Repair Required) <br />The objective of this test Is to provide assurance that the when the E -Stop switch Is activated, all the fueling system circuits (turbines, and dispensers) are de -energized, and <br />remain de -energized until they are reset manually). The test procedures and guidelines shall be In accordance with the Estop Testing Process. <br /># ,The following Information is to be completed. <br />2 Type of Switch? Push Pull X Momentary Plain light t Toggle Other: <br />(if Momentary type, locate and identify re -set button): In Elect Room <br />3 Type of Turbine Control Relay System (Electrical Distribution Center): <br />Brown Box Power Solution X Other Custom Fabricated <br />of Line Leak <br />Wwo <br />X To <br />s <br />IDoes the E -Stop shutdown power to the DISPENSERS <br />x <br />T <br />Does the E -Stop shutdown power to the TURBINES <br />x <br />8 <br />g <br />Is the 220 voltage to the turbine relay removed (either the line side or the motor side of the contacts or the coil)? <br />Are the DISPENSER BREAKERS clearly identified / labeled? <br />x <br />x <br />10 <br />Are the TURBINE BREAKERS clearly identified / labeled? <br />x <br />11 <br />12 <br />Are all the ESOs accessible and clearly identified / labeled? <br />Did the ESO(s) function correctly (de -energized from either the line side or the motor side of the contacts or the coil)? <br />x <br />x <br />12A I If #12 is NO, briefly describe what was wrong: <br />How was it corrected: <br />If repair or ESO functionality cannot be corrected same day (prior to leaving the site). The technician MUST notify the Site <br />Manager of the problem, place an "Out of Service" Tag on the ESO(s), and identify an alternate mean (i.e., locate circuit <br />panel , clearly identify turbine and dispenser breakers for shut-off in the event of an emergency). <br />Elite Customer Solution Center has been contacted for the repair. <br />eMaint. W.O. Ticket # <br />N13 <br />Site's fueling system is fully operational. x <br />All equipment secured and any access ports, lids, enclosures are closed. x <br />All safety barricades, and any debris was been removed. I x <br />t completed copy with other documentation In E-Malntenance. <br />
The URL can be used to link to this page
Your browser does not support the video tag.