My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1987-1998
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1501
>
2300 - Underground Storage Tank Program
>
PR0231989
>
COMPLIANCE INFO_1987-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2022 4:24:09 PM
Creation date
6/23/2020 6:54:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987-1998
RECORD_ID
PR0231989
PE
2361
FACILITY_ID
FA0003976
FACILITY_NAME
VALLEY PACIFIC CHARTER WAY CARDLOCK
STREET_NUMBER
1501
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16337016
CURRENT_STATUS
01
SITE_LOCATION
1501 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231989_1501 W CHARTER_1987-1998.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
316
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
y 19. Secondary container other than to -walled tanks (incl interception <br />and detection system). lSection 2633 Ml <br />A. Backfill in secondary container. t tion 2635 (c) 1.81 <br />B. Pore`space of granular material used as backfill for primary container(s) complies with tion 2631 <br />(g). (Engineering data to support capacity requirement]. <br />C. Two or more primary containers within secondary container. (include information on product <br />compatibility) <br />0. Secondary container capable of precluding highest anticipated groundwater. <br />E. Secondary container sloped to • monitoring sump from which leakage or precipitation can be detected <br />and removed. <br />F. Nater tight comer which extends at least s foot beyond each boundary of the secondary container <br />excavation, sloped to drain away from excavation. <br />20. secondary container(s) thickness, density. Composition, Product compatibility. <br />Sized to contain unauthorized releases from primary containers to allow sufficient time for tection removal. <br />[Section 2631 (c)3 <br />21. Secondary container(s) van tric requir to: (Section 2631 (a) (1) <br />® and (2)) <br />A. Single primary containers a 1 <br />B. Multiple primary containers o 150% of largest primary, tainer or 10% tea <br />22. secondary container(s) Open to,rainfatt. t section 2631 Ml <br />Volumetric requirements a 24 hours of 100 r stoma on to primary container volumes. <br />23. Secondary container floor. tSection 2631 (i)) <br />A. constructed on firm . <br />B. Sl to collection ( 1/ inch per foot). <br />(1) or more ass casings installed in <br />(a) Size to allow removal of collected liquid. <br />(b Ext to gr surface. <br />(c) Covered with a locked waterproof cap or <br />within a secured facility. <br />(d) Thickness allows for anticipated stresses. <br />(e) Construction materials are not weakened stored product or will not donste, <br />capture, or mask constituents to be monitored. <br />24. Membrane liner $if.lastions. [section 2631; k, I. and ml <br />M <br />
The URL can be used to link to this page
Your browser does not support the video tag.