My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1987-1998
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1501
>
2300 - Underground Storage Tank Program
>
PR0231989
>
COMPLIANCE INFO_1987-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2022 4:24:09 PM
Creation date
6/23/2020 6:54:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987-1998
RECORD_ID
PR0231989
PE
2361
FACILITY_ID
FA0003976
FACILITY_NAME
VALLEY PACIFIC CHARTER WAY CARDLOCK
STREET_NUMBER
1501
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16337016
CURRENT_STATUS
01
SITE_LOCATION
1501 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231989_1501 W CHARTER_1987-1998.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
316
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ir-lq <br />18. <br />® Any special accessories, f I itings, coatings, or linings inherent within the initial design of the 10 tank or double - <br />watt UST. (Section 2631 (r)] <br />A. Approved by a nationally rec zed independent testing organization. <br />s. Demonstration of integr with the 10 tank or double matted UST. <br />Tanks subject to floatation. ( on 2631 (s)] <br />A. Anchored by or stab. <br />B. Anchors be installed is specified by manufacturer. <br />C. t Ration details provided on plans. <br />D. Calculations provided. <br />Fiber liners between tank(s) and excavation to prevent infiltration of native Boit into backfitt eaterist. <br />0 <br />of <br />E. <br />Other types tankO <br />® (1) Chemical composition of mierial stored is provided. <br />(2) Chemical abstract service nueber(CASs) <br />14. Overftow prateIctlon system (detiit drawing of split catc mit tn(s)/piping . s) required, including tank fill mid alt <br />openings). <br />[Section 2635 (b) (8)] <br />A. <br />Spitt catchment basin. <br />Capacity: oc" <br />Type: <br />B. <br />Manuel monitoring (motor vehicle fuels only). <br />(1) Written fitting procedure: (section 2635 (9) (A) (8) (C)] <br />(a) Tank votum, capacity is at 103% or +200 gallons. <br />(b) Metered product entering UST and tank capacity <br />® <br />determined immediately prior to filling. <br />_ C. <br />Nechha ical/Electronic monitoring (mandatory for non -motor vehicte fuel t s) (Section (8) (A) (8) (C)] <br />V (1) Level sensing device and 82 or 03 below. <br />(2) Audible/visuat alarm triggered by a liquid twat sensor. <br />(3) Automile shut-off. <br />15. Double -walled tank end system allow for monitoring of the wviutar space. <br />(Section 2635 (8) (A) (8) (C)] <br />A. <br />Reiieese from 10 eontsir>er designed to drain to a specific Loco within the amuler to be detected by <br />a monitoring device or method. <br />B. <br />Conti electronic monitoring connected to audi a/visual alarm system. <br />® C. <br />Type of Detectors (Detail of monitoring equ t as instatted). <br />(1) Brand Now: <br />e s (2) t N' r: <br />d <br />(3) Sensor T w, Vapor Liquid both. <br />(4) Sification. <br />MW <br />hures provided, <br />(6) sourer°s written Installation instructions. <br />location of probe for: <br />(tank): (piping): <br />ir-lq <br />18. <br />® Any special accessories, f I itings, coatings, or linings inherent within the initial design of the 10 tank or double - <br />watt UST. (Section 2631 (r)] <br />A. Approved by a nationally rec zed independent testing organization. <br />s. Demonstration of integr with the 10 tank or double matted UST. <br />Tanks subject to floatation. ( on 2631 (s)] <br />A. Anchored by or stab. <br />B. Anchors be installed is specified by manufacturer. <br />C. t Ration details provided on plans. <br />D. Calculations provided. <br />Fiber liners between tank(s) and excavation to prevent infiltration of native Boit into backfitt eaterist. <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.