Laserfiche WebLink
3EMCO C�3 b p . 2 <br />155 l 11/ charf <br />LOCTION: Charter Way, Stockton -R<2 <br />. <br />2. Following the excavation and removal of the fuel from <br />the storage tank by others, NORCAP Services will evacuate, enter, <br />clean out and inspect the tank. The owner shall supply a vacuum <br />truck or approved waste containers for sludge removal and shall <br />be responsible for the proper disposal of same. Following the <br />approval of the tank for lining, we shall sandblast the entire <br />inner surface of the tank to SSPC # 5 White Blasted Surface in <br />accordance with the enclosed specifications. We will next apply <br />a prime coat of NSS 37E Epoxy resin primer at not less than 10 <br />mils in thickness. Prime coats to be applied within eight hours <br />of sandblasting or prior to any blush rust forming if a condition <br />of high humidity exists. Two layers of 2 oz. chopped strand <br />fiberglass mat will be hand applied and properly wetout with like <br />resins. All entrapped air will be removed using grooved rollers. <br />Following the initial cure of the laminates, we will spark test, <br />visually inspect the entire inner surfaces, sand all protrusions <br />and repair any areas that show need of same. Following the cure <br />of the laminates, we will apply two seperate coats of resin, not <br />less than 5 mils each as a final seal coat. Laminates shall be <br />post cured at a 150OF for four hours to produce proper cure. <br />COSTS SHALL APPLY AS FOLLOWS: <br />LOCATION: Charter Way, Stockton <br />Three - 4,000 Gal (epoxy system) <br />COST to open, clean out and inspect the 3 tanks ... $ 4,950.00 <br />ADDITIONAL COST to reline the above tanks <br />following inpection and approval .................. 9,900.00 <br />COST OF PERMITS ................................... 330.00 <br />TOTAL COST not to exceed ........................$ 15,180.00 <br />NOTICE TO START: 2 Weeks <br />PRICE GOOD FOR: 60 Days <br />If I can be of further help please feel free to call me at area <br />code 209-745-9161. <br />NORCAP Services warrants all materials and workmanship for a <br />period of ten years from date of completion. This warranty <br />applies to all epoxy lined tanks regardless of fuel type and <br />polyester lined tanks for fuel oil and diesel fuel only. <br />We wish to thank you for this opportunity to quote on your <br />requirements and look forward to serving you on this and your <br />future corrosion protection requirements. If favored with your <br />order, please sign the enclosed acceptance form and return to the <br />address above. <br />