My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1987-1998
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1501
>
2300 - Underground Storage Tank Program
>
PR0231989
>
COMPLIANCE INFO_1987-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2022 4:24:09 PM
Creation date
6/23/2020 6:54:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987-1998
RECORD_ID
PR0231989
PE
2361
FACILITY_ID
FA0003976
FACILITY_NAME
VALLEY PACIFIC CHARTER WAY CARDLOCK
STREET_NUMBER
1501
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16337016
CURRENT_STATUS
01
SITE_LOCATION
1501 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231989_1501 W CHARTER_1987-1998.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
316
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E__] <br />W <br />TECHNICAL SPECIFICATIONS <br />USING NSS 37E EPDXY/FRP TANK LININGS <br />PAGE 2 <br />The procedure for installation of the above lining system shall <br />be as follows: <br />1. Isolation of the tank. <br />2. Purging the tank of explosive fumes. <br />I <br />3. Entering the tank. <br />4. Cleaning and sandblasting. <br />5. Application of the NSS 37E Liner. <br />6. Tank closure and testing. <br />1. GENERAL <br />A. In addition to obtaining the required permits, etc., the <br />Contractor will obtain the approval of the local Fire Marshall <br />and/or the regulating authorities, where required. <br />B. The scope of the contract covers a turnkey job including, but not <br />limited to, excavation, opening tank, safe removal and disposal of <br />bottom sediment and water, tank surface preparation, liner <br />application, testing and closure of the tank and finishing of <br />grade to its original surface. <br />C. NORCAP Sales and Services instructions are to be followed in the <br />handling, mixing and application of the resin compounds. <br />D. There will be a CONTRACTOR'S employee on hand at all times, <br />who understands lead hazard and the fire and explosion <br />potential.as he will be responsible for maintaining a safe <br />environment in the work area. <br />E. The CONTRACTOR shall be familiar and comply with the relevant <br />procedures established by all Federal, State and Municipal <br />mandates. <br />F. Owner or his agent will remove the free product from the tank, <br />leaving the bottom sediment and water for removal by the <br />CONTRACTOR. Bottom sediment and water shall be disposed of by the <br />owner or his agent in a safe manner that is acceptable to the <br />Local, State and Federal regulatory agencies. <br />G. Before any work is done, the work area is to be barricaded and the <br />required danger and caution signs posted. The area is to be kept <br />free of sources of ignition during the work period. <br />H. The CONTRACTOR will have on hand, a properly maintained and tested <br />portable fire extinguisher, with a minimum Underwriter Laboratory <br />extinguisher rating of 12 B. <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.