Laserfiche WebLink
FROM <br />(WEN SEP 13 <br />2006 18' 5/ST,18.03/No•6843597367 P 5 <br />j B, January 2002 <br />Page of <br />g <br />S. SECO1Vi/PR.i. PIPE iESITNG <br />est Method Developed By: <br />Viping Manufacturer ❑ Industry Standard ❑ Professional Engincer <br />& <br />❑ Other (Specify) <br />jTest Method Used: <br />> Pressure <br />❑ 'Vacuum Li Hydrostatic <br />❑ Other (Sped) <br />Test Equipmcnt Used: <br />Equipment Resolution: <br />Piping Ran # / $ 7 <br />Piping Run # 2—t <br />Piping Run # ! t ':P <br />Piping Run # z, <br />Piping Material: <br />P <br />i Piping Manufacturer: <br />%U n <br />ru n <br />r'• <br />✓. v'9 <br />j Piping Diameter: <br />211 <br />j Length of Piping Run: <br />;-u 1 <br />Product Stored: <br />"o l' <br />4 `7 <br />-G <br />Method and location of <br />7 ,^ r , nC -C^ r►P <br />'r,,, r4 At Sa+ �i <br />7k T G� n.e �► -se <br />-rt, /4 <br />in -run isolation: <br />tc.SL b®�'�- <br />���,r� <br />•�' <br />Sf G.�� <br />Wait time between applying <br />pressure/vacuum/water and <br />C+ r <br />P <br />(v►^ '" <br />/��, ,'�1 <br />f <br />i S'w. n <br />starti test; <br />Test Start Throe: <br />/0 ,. 21 <br />; �•<7 <br />! GtJ <br />Initial Reading (R,): <br />S • 0 <br />Test End Time: <br />! ; j <br />/ 2 <br />Z %. a <br />Final Reading (RF): <br />, <br />I <br />, <br />Test Duration: <br />Change in Reading (RF -RI): , S,�-- <br />Fass/Fail Threshold or <br />Criteria: <br />'fest Result: ❑ Pass ail ❑Pass Fait Pass ❑ Fail Pala ❑hail <br />Comments — inetude in ormati n on re irs made 42r to testing, and recommended flow -u or ad tests <br />