Laserfiche WebLink
FROM <br />(WED) SEP 13 2006 <br />1 5/ST, 18.03/No. 6843597367 P 6 <br />L <br />;B, January 2002 <br />Page of <br />6. PIPING SLUMP TESTING <br />est Method Devcloped By: <br />❑ Sump Manufacturer <br />�gftndustry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: <br />a Pressure <br />❑ Vacuum <br />pdIydrostatic <br />❑ other (Specify) <br />Test Equipment Used: _ .Co v, <br />' S TS <br />Equipment Resohution:D» ®c+ 1 I <br />Sump # <br />Sumg # <br />Suinp # Sump # <br />Sump Diameter <br />U <br />Sump Depth: <br />Sump Material: <br />ELZ <br />Height from Tank Top to Top of <br />�7 <br />/ 14 <br />Highest Pi Penetration: <br />1 p <br />f <br />Height from'Tank Top to Lowest <br />�Q <br />Electrical Penetration: <br />O <br />Condition of sump prior to testing: <br />a <br />Portion of Sump Tested` <br />M <br />M <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />A-Yes 0 No ❑ NA <br />CYcs ❑ No 0 NA <br />D Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br />product and water ?• <br />Turbine shutdown response time <br />Iiss system programmed for fail-safe <br />yes Cl No ❑ NA <br />Kj_Yes [3 No 0N <br />❑Yes ❑ No ❑ NA 13 Yes (1 No ❑ NA <br />Jl]llWownf <br />Was fail-safe verified to be <br />Wes 11 No 11 NA <br />NA <br />+:6 ❑ No C10 <br />t y <br />VI Yep ❑ No NA ❑ Ye-❑ 1Vo ❑ NA <br />D <br />'e <br />o erational. <br />ait time between applying <br />t <br />pressure/vacuum/water and starting <br />15" A <br />, <br />test: <br />Test Start Time: <br />r'.2 : Y3 <br />I.:z� illy <br />Initial Reading (Rj): <br />4,02q li. a 2fi7 <br />Itp , it <br />Test End Time-0-49 <br />Final Reading (Rt,): <br />029q-07-1 <br />.' <br />Test Duration: <br />IA <br />Change in Reading (RF-Rt): <br />Pass/Fail Threshold or Criteria: <br />p 2 a' �- <br />W?O-L- I <br />Test Result: <br />g Pass ❑ Fail <br />prpan ❑ Vai! <br />o Pass 0 Fail ❑ Pass ❑ Fail <br />Was sensor removed for tcsting? <br />Yes ❑ No ❑ NA <br />Yes ❑ No a NA <br />❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br />Was sensor properly replaced and <br />Yes Q No ❑ NA <br />)tCes 0 No ❑ NA <br />❑ Yes ❑ No Q NA <br />❑ Yes ❑ No 0 NA <br />L erified functional after testis ? <br />Comments — (include in grmation on re ire made pd2r tri testing, and r"mmendtd o11ow-u or ailed tests <br />i rs <br />if the entire depth of the sump is not tested, specify how much was tested. If the answer to aW of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entirc sump trust be tested. (See SWRCB LG -160) <br />