Laserfiche WebLink
.;B, January 2002 <br />A CPTT.i./(IVF.RFii.i. irnNT®iNMF.NT RnYF.0 <br />Page 7 of S <br />i acility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br />Spill/Overfill Containment Boxes are Present, but were Not Tested ❑ <br />Test Method Developed By: ❑ Spill Bucket Manufacturer Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: ❑ Pressure ❑ Vacuum ,hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: ' A c o X. - 5—/S Equipment Resolution: F31ffi <br />Spill Box # 91 <br />Spill Box # I <br />Spill Box #2 L <br />Spill Box XL <br />Bucket Diameter: <br />L'� <br />i % -- <br />1°2.`, <br />Bucket Depth: <br />1 tq <br />( tt <br />1 <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />w t\ <br />Test Start Time: <br />J (} 0 $ t .' Z'7 <br />Q:CY <br />Initial Reading (Rj): <br />3.j Z. L `� 25- <br />2.25'7 <br />Test End Time: <br />0 : Z 3 I d% yZ <br />10:21 <br />I c -S OO <br />1 \ =5$ <br />Final Reading (RF): <br />`;, S Z57 j. rd Z 5— <br />2 J q6 I <br />q kv,311 <br />Test Duration: <br />r yn' yt <br />(��, <br />Change in Reading (RF -R,): <br />-_O. y <br />Pass/Fail Threshold or <br />Criteria: <br />d. r - Z- �, DO <br />,, o®� <br />r c L <br />—, 00 1—.00 <br />Test Result: <br />o Pass 0Fil <br />❑ Pass Fail <br />❑ Pass Fail <br />Pass ❑Fail <br />i <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />34 <br />Z el r a �`' <br />i <br />