Laserfiche WebLink
8, January 2002 <br />5. SECONDARY PIPE TESTING <br />Page !� of 8 <br />..=.,u""".'UvciUPcu ny: ':*SYtpmg Manufacturer ❑ Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: $QPressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Sped) <br />Test Equipment Used t ,a Ss ; a 2.J 14L -i". Resolution- �S� <br />�>�� �� ���a � �,, �� . _. ., Equipment1 l <br />Piping Run # f - Piping Run # S y Piping Run # Piping Run # <br />Piping Material: <br />"'L f) <br />h <br />Piping Manufacturer:`,,, <br />Piping Diameter: <br />Length of Piping Run: <br />1 <br />Product Stored: <br />f �� <br />Method and location of <br />i in -run isolation: <br />MtJot� <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />(A <br />U "A <br />Test Start Time: <br />Initial Reading (RI): <br />; <br />2 <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />Change in Reading (RF -RI): <br />_ <br />Pass/Fail Threshold or <br />Criteria: <br />- <br />Test Result: <br />Pass ❑ Fail ±��Pas�soail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />