Laserfiche WebLink
03/18/2015 02:13PM 6616349233 KERN CONSTRUCTION PAGE 19/27 <br /> • <br /> SWRCB,January 2002 Page of� <br /> 8. PIPING SUMP TESTING <br /> Test Method Developed By: ❑ Sump Manufacturer X Industry Standard G Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum X Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used:Incon is-sts Equipment Resolution:.001" <br /> Sump#87 Sump#DSL Sump# Sump# <br /> Sump Diameter: 42" 42" <br /> Sump Depth: 48" 48" <br /> Sump Material: FRP FRP <br /> Height from Tank Top to Top of 20„ 19" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 30" 30" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: good good <br /> Portion.of Sump Tested' 1/2 1/2 <br /> Does turbine shut down when <br /> sump sensor detects liquid(both X Yes ❑No 0 NA X Yes ❑No ❑NA ❑Yes O No ❑NA ❑Yes ❑No ❑NA <br /> product and water)?' <br /> Turbine shutdown response time 3 sec 3 sec. <br /> Is system programmed* for fail-safe <br /> shutdown? X Yes ❑No ❑NA X Yes ❑No ❑NA ❑Yes ❑No DNA ❑Yes ❑No ❑NA <br /> Was fail-safe verified to be <br /> operational?* X Yes ❑No ❑NA X Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Wait time between applying <br /> pressure/vacuum/water and starting 15 min. 15 min. <br /> test: <br /> Test Start Time: 6:25 6:25 <br /> Initial Reading(RI): 2.543 3.579 <br /> Test End Time: 6:40 6:40 <br /> Final Reading(RF): 2.542 3.579 <br /> Test Duration: 15 min 15 min <br /> Change in Reading(RF-RI): 0.001 0.0 <br /> ass ail Threshold or Criteria: -.002 -.002 <br /> Test Result: . X Pass ❑Fail X Pass O.FAR : 11 .Pass_ 0 Fail' P Pass ❑Fail <br /> Was sensor removed for testing? X Yes ❑No ❑NA X Yes ❑No ❑NA ❑Yes ONO ❑NA ❑Yes ❑No ❑NA <br /> Was sensor properly replaced and X Yes ❑No ❑NA X Yes ❑No ❑NA ❑Yes ❑No [INA ❑Yes ❑No ❑NA <br /> verified functional after testis _ <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> MAR f 9 2015 <br /> - ENVIRMAPNITn 1 <br /> t,►-a"ry�r,c�a'�,-,�c��T ' <br /> 'If the entire depth of the sump is not tested,specify how much was tested. If the answer to MY of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br /> Received Time Mar. 18, 2015 3: 16PM No- 8366 <br />