My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2016
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1501
>
2300 - Underground Storage Tank Program
>
PR0231989
>
COMPLIANCE INFO_2008-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2022 8:46:42 AM
Creation date
6/23/2020 6:54:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2016
RECORD_ID
PR0231989
PE
2361
FACILITY_ID
FA0003976
FACILITY_NAME
VALLEY PACIFIC CHARTER WAY CARDLOCK
STREET_NUMBER
1501
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16337016
CURRENT_STATUS
01
SITE_LOCATION
1501 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231989_1501 W CHARTER_2008-2016.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
383
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />5. SECONDARY PIPE TESTING <br />0 Page 5 of � <br />Test Method Developed By: D Piping Manufacturer 74ndustry Standard 11 Professional Engineer <br />0 Other (Specify) <br />Test Method Used: -J�Rressure El Vacuum 0 Hydrostatic <br />11 Other (Specify) <br />Test Equipment Used: iV1 jWe55Equipment <br />Resolution: <br />MAW <br />177771MM-77777777,77 77"E7 777,77 <br />Piping Run # <br />Piping Run# J),eVt <br />Piping Run# 6 5,ctl <br />Piping Run# <br />Piping Material: <br />R?4.2 <br />Piping Manufacturer: <br />ek <br />Piping Diameter: <br />h <br />Z N <br />0 <br />Length of Piping Run: <br />l <br />i <br />zo <br />Product Stored: <br />474 <br />e , <br />Method and location of <br />piping -run isolation: <br />r <br />011"If p <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />Test Start Time: <br />7' 5-0 <br />-74-C, <br />Initial Reading (Rj): <br />S L) <br />0 <br />L <br />Test End Time: <br />Y. 7-6 <br />4,0 <br />Final Reading (RF): <br />J <br />Test Duration: <br />Change in Reading (RF -R,): <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result: <br />Pass 0 Fail <br />"ass 0 Fail <br />Pass 0 Fail <br />,�as!q Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.