Laserfiche WebLink
SWRCB, January 2002 <br />M. WWI \ 1� <br />Page 'f of 6l <br />Test Method Developed By: ❑ Sump Manufacturer '.Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: ❑ Pressure ❑ Vacuum ....Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used:�1CG A �- ST <br />Equipment Resolution: v. -)i <br />" ° ` 1 K.+Th <br />...� "v.5.,. , • C F sS <br />}F <br />Sump.7UYII <br />o t S•t <br />S'i'�„'1t _ <br />Sump # ?�) <br />Sump # <br />(� <br />p # <br />Sump Diameter: <br />Z <r► <br />y °� <br />Sump Depth:, <br />G1 <br />Sump Material: <br />! 7 11 <br />j0 <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />N <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />m <br />. L4 <br />L. <br />Condition of sump prior to testing: <br />76 <br />Portion of Sump Tested' <br />'Z L{ 1` <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />product and water)?` <br />C�Yes' ❑ No ❑ NA <br />[des ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Turbine shutdown response time <br />Is system programmed for fail-safe <br />shutdown?* <br />[Yes ❑ No ❑ NA <br />.Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Was fail-safe verified to be <br />operational'? <br />Yes ❑ No ❑ NA <br />Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Wait time between applying <br />pressure/vacuum/water and starting' <br />test: <br />1^ <br />5 ✓d <br />Test Start Time <br />2-, <br />Initial Reading (RI): <br />1'ti.�t 4� <br />?. 5.j) <br />`iS L CS"2 <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />A <br />■ <br />I��Y� <br />r <br />�4`l'1i 71 f�M9e'1 <br />Change in Reading (RF -RI): <br />Pass/Fail Threshold or Criteria: <br />,d�2 <br />�, J;jZ_ <br />Test Result: <br />9L Pass ❑ Fail <br />.Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Was sensor removed for testing? <br />V -Yes ❑ No ❑ NA <br />,9Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />J�Xes ❑ No ❑ NA <br />-Yes ❑ No ❑ NA <br />❑Yes ❑ No ❑ NA <br />❑Yes ❑ No ❑ NA <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to aM of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />