My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2016
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1501
>
2300 - Underground Storage Tank Program
>
PR0231989
>
COMPLIANCE INFO_2008-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2022 8:46:42 AM
Creation date
6/23/2020 6:54:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2016
RECORD_ID
PR0231989
PE
2361
FACILITY_ID
FA0003976
FACILITY_NAME
VALLEY PACIFIC CHARTER WAY CARDLOCK
STREET_NUMBER
1501
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16337016
CURRENT_STATUS
01
SITE_LOCATION
1501 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231989_1501 W CHARTER_2008-2016.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
383
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S)WRCB,January 2002 Page '2- of <br /> 4. SECONDARY PIPE TESTING <br /> Test Method Developed By: 0 Piping Manufacturer x Ind4stry Standard 0 Professional Engineer <br /> 0 Other(Specify) I <br /> Test Method Used: x Pressure 0 Vacuum 0 Hydrostatic <br /> 0 Other(Specify) I <br /> Test Equipment Used:4"dial gauge Equipment Resolution:0-15 psi <br /> Piping Run# 7 Piping Run# Piping Run# Piping Run# <br /> Piping Material: FRP <br /> Piping Manufacturer: Ameron 7 <br /> Piping Diameter: 315 <br /> Length of Piping Run: 50' <br /> Product Stored: DSL <br /> Method and location of Test boot <br /> piping-run isolation: MAR 112(16 <br /> Wait time between applying <br /> pressure/vacuum/water and 30 min. ENVIRONMENTAL <br /> starting test: <br /> Test Start Time: 4:10 <br /> Initial Reading(RI): 5.0 PSI <br /> Test End Time: 5:10 <br /> Final Reading(RF): 5.0 PSI <br /> Test Duration: I HR. <br /> Changein Reading(RF-Ri): 0 PSI <br /> Pass/Fail Threshold or <br /> Criteria: 0 PSI <br /> Fait <br /> PAM <br /> Comments—(include information on repairs made prior to testing, and recommendedfollow-up for failed tests) <br /> Ti&tgned entryfitting. <br /> f <br />
The URL can be used to link to this page
Your browser does not support the video tag.