Laserfiche WebLink
03/18/2015 02:13PM 6616349233 KERN CONSTRUCTION PAGE 15/27 <br /> SWRCB,January 2002 Page Z of <br /> 4. TANK ANNULAR TESTING <br /> Test Method Developed By: ❑Tank Manufacturer X Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure X Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used:Vacuum Gauge Equipment Resolution:0.2"HG <br /> !IT!nk#87 Tank#DSL Tank# Tank# <br /> Is Tank Exempt From Testing?' ❑Yes X No ❑Yes X No ❑Yes 11 No ❑Yes ❑No <br /> Tank Capacity: 12,000 Gallon 12,000 Gallon <br /> Tank Material: Steel Steel <br /> Tank Manufacturer: Modem Modem <br /> i <br /> Product Stored: 87 DSL <br /> I V r.D— <br /> Wait time between applying MAR 8 2015 <br /> pressure/vacuum/water and 30 Min. 30 Min. <br /> startingtest: <br /> Test Start Time: 7:00 8:30 MENTAI <br /> Initial Reading(Ri): 10"HG 10"HG �osVrioc%r <br /> Test End Time: 8:00 9:30 <br /> Final Reading(RF): 10"HG 10"HG <br /> Test Duration: 1 HR. 1 HR <br /> Change in Reading(RF-RI): 0.0"HG 0.0"HG <br /> Pass/Fail Threshold or Criteria: 0.0"HG 0.0"HG <br /> Test Result:. X.Pass 0 Fail X.Pass. D Fail ❑ Pass ❑.Fail U:Pass i7'Fai1.::.::: <br /> Was sensor removed for testing? X Yes ❑No ❑NA X Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Was sensor properly replaced and <br /> verified functional after testing? X Yes ❑No ❑NA X Yes ❑No ❑NA ❑Yes ElNo fl NA 11 Yes ❑No ElNA <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> 1 Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary <br /> containment,such as systems that are hydrostatically monitored or under constant vacuum,are exempt from periodic containment <br /> Received Time°Mar 18. °2015 3:16PM"No?8366ion2637(a)(6)} <br />