Laserfiche WebLink
03/18/2015 02:13PM 6616349233 KERN CONSTRUCTION PAGE 16/27 <br /> SWRCB,January 2002 Page 3 of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer x Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: x Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used:4"dial gauge Equipment Resolution:0-15 psi <br /> Piping Run#DSL Piping Run#87 Piping Run#Sat 6 Piping Run#Sat 7 <br /> Piping Material: FRP FRP FRP FRP <br /> Piping Manufacturer: Ameron Ameron Ameron Ameron <br /> Piping Diameter: 3" 3" 3" 3" <br /> Length of Piping Run: 50' 50, 15' 15' <br /> Product Stored: DSL 87 DSL DSL <br /> Method and location of Test boot Test boot Riser Riser <br /> i in -run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 30 min. 30 min. 30 Min. 30 Min. <br /> starting test: <br /> Test Start Time: 7:00 7:00 8:45 10:20 <br /> Initial Reading(Ri): 5.0 PSI 5.2 PSI 5.0 PSI 5.0 PSI <br /> Test End Time: 12:00 12:00 9:45 10:20 <br /> Final Reading(RF): 5.0 PSI 4.5 PSI 5.0 PSI 5.0 PSI <br /> Test Duration: 1 HR. 1 HR. 1 HR 1 HR <br /> Change in Reading(RF-Rr): 0 PSI 0.7 PSI 0.0 PSI 0.0 PSI <br /> Pass/Fail Threshold'or 0 PSI 0.0 PSI 0.0 PSI <br /> Criteria: 0 PSI <br /> Test Results_ X Pass ❑Fail ❑ Pass X F ail X Pass ❑,Fail X Pass'. ;p 2+'ari <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> MAR 18 ZU15 <br /> ENVIRCINAAMIT„t <br /> Received Time Mar. 18. 2015 3: 16PM No. 8366 <br />