Laserfiche WebLink
r ' <br /> File MH28727 Vol. 1 Sec. 1 ILL-IA(Page 1)1ssued: 2004-01-05 <br /> And Report <br /> STEP 1 identify the damaged boot and select the proper Bluchor Repair <br /> Mont basmrol upon the number of studs mild the pipe OD.(See 2006 <br /> Catalog,S vdan 10 and Appendix 1) <br /> 'l <br /> I ; <br /> SYEP 2 Remove band damps from old fittmg.Remove the nuts from the <br /> stubs and store for future use.Remove old tiding,The Ad fitting <br /> will need to be cut off.Take care not to damage the secondary <br /> Pipe. <br /> S'fEP 3 Install an Methane split components onto the pipe earefolty.;1n <br /> Pellethane pieces must be rebonded back tngether with ldue Seal <br /> Glue.The is dome by ensuring that the sorfaces are clean and dry. <br /> Apply a liberal bead of Bber Seal and told the closed <br /> securely int l it is fused.It's helpful to use the.lamps to loosely <br /> hold the boot closed during curing. Bonded connections should <br /> held themselves dosed within five minutes if there are no stresses <br /> on them.'fhe Blue Seal glue will he fully cured in 40 minutm <br /> e <br /> e, <br /> STEP 4 Ona all components are bonded,apply a liberal head of 6WWPr <br /> Bomik H 10OFS to the underside of the <br /> This will make the seal with the sump wall.Insert poly ring into <br /> the gasket and puaidon it onto the studs and up against the sump °\ <br /> �o <br /> W SII. <br /> STEPS Reinstall nuts and tighter,them in a star pattern. <br /> 0060438298 <br />