My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOCKEFORD
>
205
>
2300 - Underground Storage Tank Program
>
PR0232257
>
COMPLIANCE INFO_2008-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2023 1:52:27 PM
Creation date
6/23/2020 6:54:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2009
RECORD_ID
PR0232257
PE
2361
FACILITY_ID
FA0000670
FACILITY_NAME
QUIK STOP MARKET #3148*
STREET_NUMBER
205
Direction
W
STREET_NAME
LOCKEFORD
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04116115
CURRENT_STATUS
01
SITE_LOCATION
205 W LOCKEFORD ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232257_205 W LOCKEFORD_2008-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
363
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r ' <br /> File MH28727 Vol. 1 Sec. 1 ILL-IA(Page 1)1ssued: 2004-01-05 <br /> And Report <br /> STEP 1 identify the damaged boot and select the proper Bluchor Repair <br /> Mont basmrol upon the number of studs mild the pipe OD.(See 2006 <br /> Catalog,S vdan 10 and Appendix 1) <br /> 'l <br /> I ; <br /> SYEP 2 Remove band damps from old fittmg.Remove the nuts from the <br /> stubs and store for future use.Remove old tiding,The Ad fitting <br /> will need to be cut off.Take care not to damage the secondary <br /> Pipe. <br /> S'fEP 3 Install an Methane split components onto the pipe earefolty.;1n <br /> Pellethane pieces must be rebonded back tngether with ldue Seal <br /> Glue.The is dome by ensuring that the sorfaces are clean and dry. <br /> Apply a liberal bead of Bber Seal and told the closed <br /> securely int l it is fused.It's helpful to use the.lamps to loosely <br /> hold the boot closed during curing. Bonded connections should <br /> held themselves dosed within five minutes if there are no stresses <br /> on them.'fhe Blue Seal glue will he fully cured in 40 minutm <br /> e <br /> e, <br /> STEP 4 Ona all components are bonded,apply a liberal head of 6WWPr <br /> Bomik H 10OFS to the underside of the <br /> This will make the seal with the sump wall.Insert poly ring into <br /> the gasket and puaidon it onto the studs and up against the sump °\ <br /> �o <br /> W SII. <br /> STEPS Reinstall nuts and tighter,them in a star pattern. <br /> 0060438298 <br />
The URL can be used to link to this page
Your browser does not support the video tag.