My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOCKEFORD
>
205
>
2300 - Underground Storage Tank Program
>
PR0232257
>
COMPLIANCE INFO_2008-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2023 1:52:27 PM
Creation date
6/23/2020 6:54:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2009
RECORD_ID
PR0232257
PE
2361
FACILITY_ID
FA0000670
FACILITY_NAME
QUIK STOP MARKET #3148*
STREET_NUMBER
205
Direction
W
STREET_NAME
LOCKEFORD
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04116115
CURRENT_STATUS
01
SITE_LOCATION
205 W LOCKEFORD ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232257_205 W LOCKEFORD_2008-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
363
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> File MH28727 Vol. I Sec. 1 ILL-IB(Page 1)Issued: 2004-01-05 <br /> And Report <br /> a,.. <br /> ti'!'EP I idendfy the damaged boot and select the proper Blueline Repair <br /> Boot based upon the number of studs anti the pipe OD.(See 2006 <br /> Catalog.Section 10 and:ippcndis 1) <br /> .r.4a. <br /> STyl'2 Install aD Peliethane spill components onto the pipe carefully.AD <br /> Pei pieces must be mbonded back ooge2her with flue Seal AIN[Glue.This is done by ensuring that the surfaces are clean and dry. <br /> Apply a liberal bead of Blue Seal and hold die seams dosed <br /> securely until it is fused.ft's belprul to use tht eltmt�to loosely <br /> hold the boot closed during curing. Bonded connections. should <br /> hold thtemmives elm within five minutes if there are no stresses <br /> on them.7'he Blue Seal glut wW be hilly cared lo 40 minutes <br /> Sl'EP.1 Once all lihieline apptm-ed components are banded, apply a <br /> liberal bead of 119ONS to the <br /> underside of the seal.This Will make the seal with the stamp wall. J <br /> Insert poly ring into the gasket and position the ring around the <br /> old fitting and agairmt the sump scall. <br /> ---'^ !res•' <br /> 1. "'rvaji: <br /> ti f YP i Install the self tapping tek screws through the hicks in the poly <br /> ting and tighten until mug,(Be careful not to over tightest as the <br /> boles can be easily stripped out.) <br /> 4T EP S Apply a bead of Moe Seal Glue along the gasket rim and lmstall <br /> the boot onto the seal. Install loot with:fill tube at the 12:00 <br /> position.Install band clamp to secure the boot to the gasket. <br /> 0060438299 <br />
The URL can be used to link to this page
Your browser does not support the video tag.