Laserfiche WebLink
0 <br /> File MH28727 Vol. I Sec. 1 ILL-IB(Page 1)Issued: 2004-01-05 <br /> And Report <br /> a,.. <br /> ti'!'EP I idendfy the damaged boot and select the proper Blueline Repair <br /> Boot based upon the number of studs anti the pipe OD.(See 2006 <br /> Catalog.Section 10 and:ippcndis 1) <br /> .r.4a. <br /> STyl'2 Install aD Peliethane spill components onto the pipe carefully.AD <br /> Pei pieces must be mbonded back ooge2her with flue Seal AIN[Glue.This is done by ensuring that the surfaces are clean and dry. <br /> Apply a liberal bead of Blue Seal and hold die seams dosed <br /> securely until it is fused.ft's belprul to use tht eltmt�to loosely <br /> hold the boot closed during curing. Bonded connections. should <br /> hold thtemmives elm within five minutes if there are no stresses <br /> on them.7'he Blue Seal glut wW be hilly cared lo 40 minutes <br /> Sl'EP.1 Once all lihieline apptm-ed components are banded, apply a <br /> liberal bead of 119ONS to the <br /> underside of the seal.This Will make the seal with the stamp wall. J <br /> Insert poly ring into the gasket and position the ring around the <br /> old fitting and agairmt the sump scall. <br /> ---'^ !res•' <br /> 1. "'rvaji: <br /> ti f YP i Install the self tapping tek screws through the hicks in the poly <br /> ting and tighten until mug,(Be careful not to over tightest as the <br /> boles can be easily stripped out.) <br /> 4T EP S Apply a bead of Moe Seal Glue along the gasket rim and lmstall <br /> the boot onto the seal. Install loot with:fill tube at the 12:00 <br /> position.Install band clamp to secure the boot to the gasket. <br /> 0060438299 <br />