Laserfiche WebLink
. A_' <br /> 0 <br /> M a <br /> File MH28727 Vol. 1 Sec. 1 ILL-1B(Page 2) Issued: 2004-01-05 <br /> And Report <br /> R� <br /> NITP 6 Petition the insert into the boot it applicable,but do not tighten Ah <br /> the damp.This eannecdon must remain loose through the filling Wu <br /> stage to aDawe air to escape_ <br /> .vrEP? FDI the boot with Bastik 11ADFS <br /> ehe mepja she ml tube with the Well psneutnstic dispensing gall � <br /> until the entire verity is tun.This will erasure that the sealant <br /> pushes back through the leak point and stops the leak <br /> SPP;P3 Once the boot is ffll,tighten dmlo and allow sealant to fully i® <br /> cure.The sealant will gradually continue to cute up insWe the <br /> Ill ami around the Gouge over the next 24.43 hours.However, <br /> you may start hydrostatic testing hussediately as the repair is <br /> cwm pli <br /> 0060438299 <br />