Laserfiche WebLink
AWL <br /> e <br /> SWRCB,January 2002 Page of <br /> 8. FILL RISER.CONTAINMENT SUMP TESTING <br /> Facility is Not Equipped With Fill Riser Containment Sums X <br /> Fill Riser Containment Sumps are Present,but were Not Tested 0 <br /> Test Method Developed By: 0 Sump Manufacturer Ll Industry Standard ❑Professional Engineer <br /> ❑Other(5edify) <br /> Test Method Used: ❑Pressure D'Vacuum ❑Hydrostatic <br /> 0 Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Fill Sump# Fill Same# Fill Sum # Fill Sump# <br /> 7�Heightfrom <br /> r: <br /> ank Top to Top of <br /> n Penetration: <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: <br /> Condition of sump prior to <br /> testing: <br /> Portion of Sump Tested <br /> Sump Material: <br /> Wait time between applying <br /> water and starting test: <br /> Test Start Time: <br /> Initial Readin (R,): <br /> Test End Time: <br /> Final Reading(R4): <br /> Test Duration: <br /> Chane in Reading F Rj : <br /> Pass/Fail Threshold or Criteria: <br /> Teo o.0 t•. <br /> Is there a sensor in the sump? <br /> Does the sensor alarm when <br /> either product or water is <br /> detected? <br /> Was sensor removed for testing? <br /> Was sensor properly replaced and <br /> verified functional after testing? <br /> Comments—(include in on repairs made prfor to testing,and recommended follow-uorLalled tests) <br />