Laserfiche WebLink
SWRCB,January 2002 Page_of <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not EquiRed With Spill/Overfill Containment Boxes D <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested X *See comments <br /> Test Method Developed By U Spill Bucket Manufacturer 0 Industry Standard n Professional Engineer <br /> F1 Other(Specify) <br /> Test Method Used: 11 Pressure El Vacuum 11 Hydrostatic <br /> D Other(Specify) <br /> Test Equipmcftt Used: E ui mentResolution: <br /> Spill Box# Spill Box# Spill Box# Spill Box# <br /> Bucket Diameter: <br /> Bucket Depth: <br /> Wait time between applying. <br /> pressurelvacuum/water and <br /> starting test: <br /> Test Start Time, <br /> Initial Reading(Ri): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-1;Q: <br /> Pass/Fail Threshold or <br /> Criteria: <br /> TestRftult: <br /> Comments—Linctude LqLor_maiion on repairs made prior to testing, recommended follow-up for failed tests) <br /> *Spiti/Overffll Containment Boxes tested annually with,Monitoring System Certification. <br />