Laserfiche WebLink
NIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> • MONITORING PLAN (Page 2 of 2) <br /> VI.UNDER`DISPENSER CONTAINMENT(UDC)MONITORING <br /> 1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490-544 <br /> 490-546 <br /> ❑ 1.CONTINUOUS ELECTRONIC MONITORING [12.FLOAT AND CHAIN ASSEMBLY 3.ELECTRONIC STAND-ALONE <br /> ❑4_NO DISPENSERS --E399_OTHER(Specify)_—–—– _----- ___—_ <br /> EL <br /> PANEL MANUFACTURER: 1� aWi5 MOD #: –'–' 490•56. <br /> LEAK SENSOR MANUFACTURER: e (`� �®! 490-s7 i MODEL#(S): Q� 490.58 <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑ a.YES ffb.NO 490-59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN [> a.YES ❑b.NO 490-60. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. a.YES ❑b.NO 490-61 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. a.YES ❑b.NO 490-62 <br /> 2.UDC CONSTRUCTION IS Url.SINGLE-WALLED ❑2.DOUBLE-WALLED 490-63 <br /> IF DOUBLE WALLED: –avo-6ae <br /> UDC INTERSTITIAL SPACE IS_MONITORED BY: ❑L LIQUID-_-2_PRES91E Q 3 VACUUM______–_________________________-___-__-______---------------- <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF T14E UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑a.YES ❑b.NO 490-64b <br /> VII.PERIODIC SYSTEM TESTING <br /> ❑ I. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-65. <br /> _ LEAK DETECTION(ELD)MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED_(23 CCR§2644 .1) _ — <br /> SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS, 490-66 <br /> SPILL BUCKETS ARE TESTED ANNUALLY. 490-67 <br /> VIII.RECORDKEEPING <br /> `?Th following monitoring/maintenance records are kept for this facility: <br /> Alarm logs 490-68a ❑Visual Inspection Records 490-68b ❑Tank integrity testing results 490-68c <br /> ❑SIR testing results(and supporting documentation records). 490-68d ❑ Tank gauging results(and supporting documentation records). 4go-68e <br /> ❑ATG Testing results(and supporting documentation records).490-68f ❑ Corrosion Protection 60-day logs 490-68g <br /> RKEquipment maintenance and calibration records. 490-68h <br /> IX.TRAINING <br /> Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties. 490-69a <br /> REE,RENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)490.696 <br /> OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)490.690 <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-69d <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490-69e <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"490.69f <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"490-69g <br /> OTHER(Specify):M69h,M69i <br /> This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> The"Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> ➢ Names of contact person(s)for emergencies and monitoring alarms.490-70 <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan.490-71 <br /> ,c>A r o �,j .A� v) 1 eL ecwC fly q4o <br /> XI.PERSON EL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that:1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The following person(s)are responsible for performing the monitoring and equipment maintenance: <br /> NAME S I. 490-72 TITLE a A f1- � G C 490-73 <br /> NAME ti eti y gq Q 490-74 TITLE 490-75 <br /> The Designated Operator shall perform a monthly visual inspection of the facility, provide a report to the owner/operator, and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XII.OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I certify that a fnfornt tion provided herein is true and accurate to the best of my knowledge. <br /> APPLICANT SI TURF 490.76 DATE: 490-77 <br /> REPRESENTIN • 1.Tank wn r/ for 2.F ili Owner/O rator 3.Authoriz d Re resentative of weer <br /> 490-78 490-79 <br /> APPLICANT NAME(print): APPLICA T TITLE: <br /> A_ <br /> UPCF UST-D(12/2007)3/4 <br />