My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
1465
>
2300 - Underground Storage Tank Program
>
PR0232272
>
COMPLIANCE INFO_2006-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 2:55:45 PM
Creation date
6/23/2020 6:54:53 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2015
RECORD_ID
PR0232272
PE
2361
FACILITY_ID
FA0003925
FACILITY_NAME
COS MUNICIPAL SERVICE CTR
STREET_NUMBER
1465
Direction
S
STREET_NAME
LINCOLN
STREET_TYPE
ST
City
STOCKTON
Zip
95206-1941
APN
16504015
CURRENT_STATUS
01
SITE_LOCATION
1465 S LINCOLN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232272_1465 S LINCOLN_2006-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
511
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK JUN 2011 <br /> MONITORING PLAN- Pae 1 of 2) <br /> TYPE OF ACTION ❑1.NEW PLAN 2.CHANGE OF INFORMATION 490-1 <br /> PLAN TYPE 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. PERMIT/SEFMCW <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEMS) <br /> 1. FACILITY INFORMATION, <br /> FACILITY ID#(Agency Use Only) ® - 47 <br /> BUSINESS NAME(Same as FACILITY NAME) 04.6u L <br /> BUSINESS SITE ADDRESS 'Lt(0i a 0-L S' 1o3. CI <br /> II.EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> -�23 CCR 2632 2634,2638 2641 <br /> -.._._-___J-__ ._--_z___ - _-_ __--_--_-_ -- --__-_-- --_ _-_-_ _ _-�--- __ __ __._____- <br /> MONITORING EQUIPMENT IS SERVICED 1.ANNUALLY ❑ 99.OTHER(Specify): 490-36 <br /> III.MONITO G LOCATIONS <br /> i.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. bj.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 63 <br /> 24 4904 <br /> IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br /> 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 490-5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT I : ❑ a_DRY b.LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM avo-6 <br /> ----------- ------------------------------------- --- -- - --_-- ------------------------------------_ <br /> PANEL MANUFACTURER: ago-z i MODEL#: v a9as <br /> -- -- --------- - --- - -' ----- - - �?- L <br /> LEAK SENSOR MANUFACTURER: _ 490-9. i MODEL#(S): ` -0--303 490-10 <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG) STEM USED TO O ITOR SINGLE WALL TANK(S).(23 CCR§2643) 49011 <br /> -------------------PANEL MANUFACTURER: 490-12. 490-13 <br /> MODEL#: <br /> -----------------------------------------------------------------------------------------.a90-14 ------------------------------------------------------- <br /> IN-TANK PROBE MANUFACTURER: MODEL#(S)_ 490-15-- _ <br /> ----------------------------------------------------------------------------------------------------------------------------- -------------------------------------- <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490-16 <br /> ❑ d.MONTHLY ❑ e.OTHERS ci 4v°-17 <br /> ---------------------- ( pe fY); <br /> ----------------------------------- -------------------------------------------------------------------------------------------------------------------------------------------------- <br /> PROGRAMMED TESTS: ❑ a.0.1 h. ❑ b.0.2 h. ❑ c.OTHER S eci 490-18 <br /> g.p.h. g.p.h. ( p �')� 490-I9 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 490-20 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: ❑ a.36 HOURS El b.60 HOURS 490-22 <br /> ❑ 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 490-23 <br /> TEST FREQUENCY: ❑ a.ANNUALLY El b,BIENNIALLY E] c.OTHER(Specify): 490-25 <br /> 490-26 <br /> ❑ <br /> 99.OTHER (Specify): 490-27 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 490"28 <br /> VISUAL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS: .DRY ❑b.LIQUID FILLED ❑c.PRESSURIZED ❑d.UNDER VACUUM 0-v°-zv <br /> ----------------------------------------------- -- -- - - -- -......... <br /> - ---- -490------_ --- - ------------------- - <br /> ® 490-30 •- 490-31 <br /> PANEL MANUFACTURER: �_ l) -� MODEL#: -U W <br /> -------------------------------------- ----- <br /> LEAK SENSOR MANUFACTURER: 490-32490 33 <br /> MODEL#(S): rnY <br /> ------------------------------------------------ - <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. [Ia.YES Wb.NO 490-34 <br /> FAILUREMISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ®'b.NO 490.35 <br /> 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED 23 CCR 2636 490-36 <br /> MLLD MANUFACTURER(S): 490-37 MODEL#(S): 490-38 <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS (23 CCR§2636) ago-39 <br /> ELLD MANUFACTURER(S) 49040 I MODEL#(S): avo41 <br /> - - - ----- - ---------------------------------------------------------------------------------'---------------- - -- ----------------------------------- <br /> PROGRAMMED IN LINE LEAK TEST: ❑ 1.MINIMUM MONTHLY 0.2 g.p.h. ❑ 2.MINIMUM ANNUAL 0.1 g.p.h. 49042 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 49043 <br /> ELLD FAILUREMISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 49044 <br /> ❑ 4.PIPE INTEGRITY TESTING 49045 <br /> TEST FREQUENCY ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) 490-4649047 <br /> ❑ 5.VISUAL PIPE MONITORING. 490-48 <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ❑C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED* 490.49 <br /> "Allowed for monitoring of unburied emergency enerator fuel piping only per HSC 25281.5 6 3 <br /> 6.SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR§2636(a)(3)1. 490-50 <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 490-s1 <br /> 490.52 <br /> ❑ 99.OTHER(Specify) 490-53 <br /> UPCF UST-D(12/2007)1/4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.