My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
1465
>
2300 - Underground Storage Tank Program
>
PR0232272
>
COMPLIANCE INFO_2006-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 2:55:45 PM
Creation date
6/23/2020 6:54:53 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2015
RECORD_ID
PR0232272
PE
2361
FACILITY_ID
FA0003925
FACILITY_NAME
COS MUNICIPAL SERVICE CTR
STREET_NUMBER
1465
Direction
S
STREET_NAME
LINCOLN
STREET_TYPE
ST
City
STOCKTON
Zip
95206-1941
APN
16504015
CURRENT_STATUS
01
SITE_LOCATION
1465 S LINCOLN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232272_1465 S LINCOLN_2006-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
511
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
171 <br />E <br />SW RCB, January 2002 1 1 6 -- <br />! Page I of <br />6�_ FILE COPY <br />5. SECONDARY PIPE TESTI 6�— <br />Test Method Developed By <br />r, pip&g Afanufacmmr <br />0 Other (Specify) <br />Olndnst,3, tl D Prafmional Engineer <br />Test Method Used: <br />®Pressure <br />0 Other (specify) <br />11 Vacuum D Hydrostatic <br />Test Equipment Used: INCON TS -STS <br />Equipment Resolution: 0.0001" <br />Piping Run 4 dsl est <br />Piping Material: <br />FIBER <br />Manufacturen <br />UNK <br />-Piping <br />Diameter: <br />311 <br />-Piping <br />of Piping Run: <br />30' <br />-Length <br />Product Stored: <br />DIESEL <br />Method and location of <br />pipinBOOT <br />g -run isolation: <br />!SUMP <br />Wait time between applying <br />pTessure/vacuunVwater and <br />starting test: <br />5MIN <br />Test Start Time: <br />0945 <br />Initial Reading (R): <br />3psi <br />Test End Time: <br />1000 <br />Final Reading (RF): <br />3 psi <br />Test Duration: <br />IHR <br />Change in Reading (RF -RI): <br />0 <br />Pass/Fail Threshold or <br />Criteria: I <br />0 <br />I <br />Test Result: = <br />I ®Pass F1 Fail <br />El Pass <br />0 Fail 0 Pass 0 Pail I D Pass <br />Comments — (include information on repairs madeprior to testing and recommen6edfollow-upfarfailed tests) <br />All testing done with inspector on site for official Testing. <br />
The URL can be used to link to this page
Your browser does not support the video tag.