Laserfiche WebLink
SWRCB, January 2002 <br />, <br />7EST1 <br />FI Page 3 of <br />(UD ING <br />Test NkOW Developed By: <br />D UDC IManufaetwer <br />D Other (Spec) <br />01ndustry stamdard U Professional Pngineer <br />Test Method Used: <br />D Pressure <br />D Other (Specify) <br />D Vacuum <br />®Hydrostatic <br />Test Equipment Used TS STS <br />Equipment Resolution: 0.0001" <br />sx �°� <br />'C.`,w,.c..e.''''G;0. e„C .Si.L�nx.. ,,,. '.•a..-ar <br />= „f� _ :' .. . 2t, <br />tiDC # 54 UDC # 9-8 <br />:: <br />DC # UDC # <br />UDC Manufacturer: <br />UNK <br />UNK <br />UDC Material: <br />PLASTIC <br />PLASTIC <br />UDC Depth: <br />10" <br />10" <br />Height from UDC Bottom: to Top <br />of Hi hest Pi ing Penetration: <br />0 <br />0 <br />Leight from UDC Bottozr to <br />Lowest Electrical Penetration: <br />0 <br />0 <br />Condition of UDC prior to <br />testing: <br />GOOD <br />GOOD <br />Portion of UDC Tested <br />3" <br />4" <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />product and water)?' <br />D Yes D No D NA <br />❑ Yes D No D <br />NA <br />D Yes D No D NA ❑ Yes D No D NA <br />Turbine shutdown response time <br />Is system programmed for fail -0— <br />safe shutdown?' <br />Yes No u NA <br />D Yes D No D <br />NA <br />C,Yes raNo uN k n Yes No ❑ NA <br />Was fail-safe verified to be <br />operational?' <br />❑Yes ❑ No ❑ NA <br />D Yes D No ❑ <br />NA <br />❑Yes ❑ No ❑ NA ❑Yes 0 No ❑ NA <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test <br />Test Start Time: <br />0859 <br />0854 <br />Initial Reading (RD: <br />.8639 <br />1.4021 <br />Test End Time: <br />0914 <br />0914 <br />Final Reading (Rr): <br />.8623 <br />1.4020 <br />Test Duration: <br />15 MIN <br />15 MIN <br />Chane in Reading (RF -RD: <br />.0011 <br />.0001 <br />Pass/Pail Threshold or Criteria. <br />0.002 <br />0.002 <br />Test Result: <br />®Pass D Fait <br />®Pass D Fail <br />D Pass ❑Fail D Pass ❑Fail <br />Was sensor removed for testing? <br />®Yes D No D NA <br />®Yes D No D NA <br />❑Yes D No D NA ❑Yes D No D NA <br />Was sensor properly replaced am <br />verified functional after testing? <br />®Yes D No DNA ' ®Yes D No DNA <br />DYes D No D NA IDYes D No ❑ NA <br />Comments — (include information on repairs made prior to testing and recommended follow-up for failed tests) <br />All Testing Done With inspector On Site. <br />1 If the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />