Laserfiche WebLink
SWRCB, January 2002 <br />Test Method Used: <br />5. SECONDARY PIPE TESTI <br />D Piping mamdactm w oLadusb), <br />❑ Other (Specify) <br />®Pressure 0 Vacuum <br />❑ Other (Sbecifv) <br />Page L of 3 <br />D PrOiFL'93Y mw Engi=r <br />0 Hydrostatic <br />Test Equipment Used: INCON TS -STS <br />Equipment Resolution: 0.0001" <br />;.trr w m a .�4.. u?lCGw'ti""' J.d�?x;`,r:. `J3$t: :Y?91."i%5.;i3%CYS'Fa^q'�'RA.F.✓199.d:;- <br />_"a^� 3 Piping Run # dst est <br />i.A�9: 'f�i:. <br />"�-R.xN`....,...c <br />Piping Material: FIBER <br />Piping Manufacturer. UNK <br />Piping Diameter: 3" <br />Length of Piping Run: 30' <br />Product Stored: DIESEL <br />Method and location of BOOT / SUMP <br />i mit isolation: <br />Wait time between applying <br />pressure/vacuum/water and 5MIN <br />starting test: <br />Test Start Time: 0$45 <br />Initial Reading W: 3psi <br />Test End Time: 1000 <br />Final Reading (RF): 3 psi <br />Test Duration: IHR <br />Change in Reading (RF -RI): 0 <br />Pass/Fail Threshold or 0 <br />Criteria: <br />Test Result: ®]Pass 0 Fail 01Pass 0 Fail 0 Pass 0 Rail <br />❑)Pass 0 Fail <br />Comments — (include information on repairs madeprior to testing, and re commendedfollofv-upforfailed tests) <br />All testing done with inspector on site for official Testing. <br />