Laserfiche WebLink
SWRCB, January 2002 Page 2 of <br />Test Method level By- 0 Piping ,41anufacturer OlRdustry Standard u Prokssiona) Engineer <br />El Other (Specify) <br />Test Method Used: OPressure 0 Vacuum 0 Hydrostatic <br />07 Other (Specify) <br />Test Equipment Used: INCON TS -STS <br />Equipment Resolution: 0.0001" <br />Piping Run # dsl est <br />Piping Material: <br />FIBER <br />Piping Manufacturer: <br />UNK <br />Piping Diameter: <br />Tv <br />FLength of Piping Run: <br />30' <br />Product Stored: <br />DIESEL <br />Method and location of <br />piping -run isolation: <br />IBOOT /SUMP <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />5MIN <br />Test Start Time: <br />0900 <br />Initial Reading (R,): <br />3psi <br />Test End Time: <br />1000 <br />Final Reading (RF): <br />3 psi <br />Test Duration: <br />IHR <br />Change in Reading (RF -R,): <br />0 <br />—Pass/Fail Threshold or <br />Criteria: <br />0 <br />Test Result <br />®Pass 11 Fail OPass 11 Fail 0 Pass 11 Fail 0 Pass 0 Fail <br />Comments — (include information on repairs pairs madeprior to testing, and recommended folloit,-tip,foi-,failed tests) <br />Replaced Secondary Boot on diesel east line in dispenser #7/8 and tightened bolts around fittings. Cleaned <br />and tightened bolts on fittings. In dispenser #5/6 and used sealant around electrical —penetrations. <br />---- --------- <br />-- -------- <br />