Laserfiche WebLink
08/27/2012 15:50 (209) 465-4988 Henderson Maintenance Cc Page 4/8 <br />SWRCB, January 2002 Page 3 of <br />kli s 1' � YMI" <br />Test Method Developed By: <br />❑ Piping Manufacturer Wndustry Standard <br />fl Other (Specify) <br />fl Professional Engineer <br />Test Method Used: <br />epressure <br />fl Other (Spero) <br />fl Vacuum <br />fl Hydrostatic <br />Test Equipment Used. iNCON TS -STS <br />Piping Run # 87 wst <br />Piping Material: FIBER <br />Piping Run # 87 est <br />FIBER <br />Equipment -Resolution. 0.0001" <br />Piping Run # dsl wst Piping Run # dsl est <br />FIBER FIBER <br />Piping Manufacturer. <br />UNK <br />UNK <br />UNK <br />UNK <br />Piping Diameter: <br />3" <br />3" <br />3" <br />3" <br />Length of Piping Run: <br />301 <br />30, <br />30' <br />30` <br />Product Stored. <br />GASOLINE <br />GASOLINE <br />DIESEL <br />DIESELL <br />Method and location of <br />i in -run isolation; <br />BOOT / SUMP <br />BOOT / SUMP <br />BOOT / SUMP BOOT / SUMP <br />Wait time between applying <br />pressure/vacuum/water and <br />Stest: <br />SMIN <br />SMIN <br />SMIN <br />SMIN <br />Test Start Time: <br />0906 <br />0906 <br />1245 <br />Initial Reading(Ril. <br />4PSI <br />4PSI <br />4PSI <br />Test End Time: <br />1006 <br />1006 <br />1006 <br />Final Reading (RFS <br />4PSI <br />4PSI <br />4PSI <br />Test Duration: <br />1 HR <br />1 HR <br />IHR <br />Change in Reading (RrRi): <br />0 <br />0 <br />0 <br />PassNail Threshold or <br />Criteria• <br />0 <br />0 <br />0 <br />0 <br />Test Result: <br />OPm fl Fail <br />®Pass fl Fail <br />®Pass fl Far? ©Pass ®Fait <br />Comments — (include information on repairs made prior <br />to testing and recommw& ollow- <br />for failed tests) <br />Visual fail on diesel product line east due boot torn in dispenser 7/8. <br />