My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
1465
>
2300 - Underground Storage Tank Program
>
PR0232272
>
COMPLIANCE INFO_2006-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 2:55:45 PM
Creation date
6/23/2020 6:54:53 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2015
RECORD_ID
PR0232272
PE
2361
FACILITY_ID
FA0003925
FACILITY_NAME
COS MUNICIPAL SERVICE CTR
STREET_NUMBER
1465
Direction
S
STREET_NAME
LINCOLN
STREET_TYPE
ST
City
STOCKTON
Zip
95206-1941
APN
16504015
CURRENT_STATUS
01
SITE_LOCATION
1465 S LINCOLN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232272_1465 S LINCOLN_2006-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
511
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
08/27/2012 15:50 (209) 465-4988 Henderson Maintenance Cc Page 4/8 <br />SWRCB, January 2002 Page 3 of <br />kli s 1' � YMI" <br />Test Method Developed By: <br />❑ Piping Manufacturer Wndustry Standard <br />fl Other (Specify) <br />fl Professional Engineer <br />Test Method Used: <br />epressure <br />fl Other (Spero) <br />fl Vacuum <br />fl Hydrostatic <br />Test Equipment Used. iNCON TS -STS <br />Piping Run # 87 wst <br />Piping Material: FIBER <br />Piping Run # 87 est <br />FIBER <br />Equipment -Resolution. 0.0001" <br />Piping Run # dsl wst Piping Run # dsl est <br />FIBER FIBER <br />Piping Manufacturer. <br />UNK <br />UNK <br />UNK <br />UNK <br />Piping Diameter: <br />3" <br />3" <br />3" <br />3" <br />Length of Piping Run: <br />301 <br />30, <br />30' <br />30` <br />Product Stored. <br />GASOLINE <br />GASOLINE <br />DIESEL <br />DIESELL <br />Method and location of <br />i in -run isolation; <br />BOOT / SUMP <br />BOOT / SUMP <br />BOOT / SUMP BOOT / SUMP <br />Wait time between applying <br />pressure/vacuum/water and <br />Stest: <br />SMIN <br />SMIN <br />SMIN <br />SMIN <br />Test Start Time: <br />0906 <br />0906 <br />1245 <br />Initial Reading(Ril. <br />4PSI <br />4PSI <br />4PSI <br />Test End Time: <br />1006 <br />1006 <br />1006 <br />Final Reading (RFS <br />4PSI <br />4PSI <br />4PSI <br />Test Duration: <br />1 HR <br />1 HR <br />IHR <br />Change in Reading (RrRi): <br />0 <br />0 <br />0 <br />PassNail Threshold or <br />Criteria• <br />0 <br />0 <br />0 <br />0 <br />Test Result: <br />OPm fl Fail <br />®Pass fl Fail <br />®Pass fl Far? ©Pass ®Fait <br />Comments — (include information on repairs made prior <br />to testing and recommw& ollow- <br />for failed tests) <br />Visual fail on diesel product line east due boot torn in dispenser 7/8. <br />
The URL can be used to link to this page
Your browser does not support the video tag.