My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
1465
>
2300 - Underground Storage Tank Program
>
PR0232272
>
COMPLIANCE INFO_2006-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 2:55:45 PM
Creation date
6/23/2020 6:54:53 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2015
RECORD_ID
PR0232272
PE
2361
FACILITY_ID
FA0003925
FACILITY_NAME
COS MUNICIPAL SERVICE CTR
STREET_NUMBER
1465
Direction
S
STREET_NAME
LINCOLN
STREET_TYPE
ST
City
STOCKTON
Zip
95206-1941
APN
16504015
CURRENT_STATUS
01
SITE_LOCATION
1465 S LINCOLN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232272_1465 S LINCOLN_2006-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
511
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
08/2712012 15:50 (209) 465-4988 Henderson Maintenance Cc Page 518 <br />SWRCE, January 2002 Page -Lof 7 <br />6. PIPING SUMP TESMG <br />TestMethod Developed —By. <br />❑ —Sump Manufacturer <br />®industry Standard 0 Professional Engineer <br />0 Other (Spew) <br />Test Method Used: <br />0 Pressure <br />0 Vacuum <br />®Hydrostatic <br />0 Other (Spe*) <br />Test Equipment Used: INCON TS -STS NEINNEW <br />I I <br />0001 <br />Equipment Resolution; 0.0001" <br />" <br />1 <br />Sump # 87 STP <br />Sump # DSL STP <br />-0 -. <br />Sump# Sump <br />SumDiameter. <br />32" <br />32" <br />Sump Depth: <br />33IT' <br />3911 <br />Sump Material: <br />FIBER <br />FIBER <br />Height from Tank Top to Top of <br />16.51, <br />301, <br />jjest Piping Penetration: <br />Height from Tank Top to Lowest <br />16" <br />29,1 <br />Electrical Penetration: <br />Condition of sump prior to testing- <br />CLEAN <br />CLEAN <br />Portion of Sump Tested' <br />IF, <br />321, <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />0 Yes DNo DNA <br />OYes ONo DNA <br />OYes allo DNA 0 Yes 0 No 0 NA <br />Product and water)?* <br />Turbine shutdown response time <br />Is system 1d for fail-safe <br />shutdown? .rogmm <br />0 Yes 0 No [INA <br />OYes ONo DNA <br />GYes CT -b DNA DYes 014o DNA <br />Was 1W 1 -safe verified to be <br />operational9* <br />0 Yes ONo DNA <br />0 Yes 01% DNA <br />DYes ONo DNA OYes ONo DNA <br />Wait time between applying <br />pressure/vacuum/water and swing <br />5 MIN <br />5 MIN <br />test: <br />Test Start Time: <br />0936 <br />1351 <br />Initial Reading (RO: <br />6.0801 <br />5.4100 <br />Test End Time: <br />0951 <br />1406 <br />Final Reading (RF): <br />6.0794 <br />5.4088 <br />Test Duration: <br />15 MIN <br />15 MIN <br />Change in Reading (RF-Ro: <br />.0007 <br />.0012 <br />PaWFail Threshold or Criteria- <br />.002 <br />.002 <br />Test Result: <br />epass 0 Fail <br />OPM 0 Fail <br />0 Pass 0 Fail 0 PASS 0 Fail <br />Was sensor removed for testing? <br />®Yes 0 No DNA <br />®Yes ONo DNA <br />OYes ONo DNA 0 Yes 0 No D NA <br />Was sensor properly replaced and <br />verified functional after testing? , <br />®Yes 0 No 0 NA <br />eYes ONo DNA <br />DYes ONO DNA DYes ONo DNA <br />I j <br />Comments — (include information on Vairs made prior to gating, and oUcy�-yp for failed tests)L _f & <br />LOOSENED ISOLATION BOOTS AYMR TESTING COMPLETED <br />'if the entire depth ofthe sump is not tested, specify how much was tested. If the answer to M of the questions indicated with an <br />asterisk (*) is "NO"or "NA!, the entire sump must be tested. (See SW RCB LG. 160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.