Laserfiche WebLink
'Moni'toring System Certification <br />OTHINIM—LYMMIMM. IWA <br />CmDlete the following checklist: <br />E <br />- <br />rl� <br />I M 74M.4, ll #1 M. R. I #1fdr.11 Ell I I <br />��MOR <br />IN <br />w LV4jM&V'rj W.1 n 1 oil L41 014r.1 I [sit <br />F®R <br />IM <br />For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br />monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate <br />positive shut -down? (Check all that apply) 0 Sump/Trench Sensors; 0 Dispenser Containment Sensors. <br />Did you confirm positive shut -down due to leaks and sensor failure/disconnection? 0 Yes; 0 No.. <br />For tank systems that utilize the monitoring system as the primary tank overfill warning device (i,e., no <br />mechanical overfill %,revention valve is installcd,l,, is the overfill waxnin�j alarm visible and audible at the tank <br />fill point(s) and operating properly? If so, at what percent of tank capacity does the alarm trigger? % <br />Was any monitoring equipment replaced? If yes, identify specific sensors, probes. or other equipment <br />replaced the manufacturer name and model for all replacement parts in Section E, below. <br />MMWas <br />-and -list <br />liquid found inside any secondary containment systems designed as dry systems? (Check all that app�y) <br />---Water. <br />, 0 Product; 0 If yes, describe causes in Section E, below. <br />OrS <br />Was monitoring systerii se( -up reviewed to ensure proper settings!' Attach set Lip reports, if applicable <br />ring equipment operational per manufacturer's specifications? <br />E. Comments: idW,2ge se L <br />Page 2 of 3 <br />