Laserfiche WebLink
-Moniloring System Certification <br />Complete the following checklist: <br />E <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />Complete the following checklist: <br />❑ Yes <br />❑ No* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />❑ N/A <br />(Check all that apply) Simulated leak rate: 03g.p.b.; 00.1g.p.h; 00.2g.p.h. <br />❑ Yes <br />❑ No* <br />I 1M 01014 <br />❑ Yes <br />❑ No* <br />Was the testing apparatus properly calibrated? <br />imom <br />sm <br />❑ No* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ N/A <br />Mill lillil <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />Complete the following checklist: <br />❑ Yes <br />❑ No* <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />❑ N/A <br />(Check all that apply) Simulated leak rate: 03g.p.b.; 00.1g.p.h; 00.2g.p.h. <br />❑ Yes <br />❑ No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />❑ Yes <br />❑ No* <br />Was the testing apparatus properly calibrated? <br />❑ Yes <br />❑ No* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ N/A <br />❑ Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />❑ N/A <br />❑ Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />❑ N/A <br />or disconnected? <br />❑ Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br />❑ N/A <br />malfunctions or fails a test? <br />❑ Yes <br />❑ No* <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />❑ N/A <br />ffy:e:s <br />I ❑ No* I <br />Were all items on the equipment manufacturer's maintenance checklist completed'? <br />11�1��Iiiq�!11111111111 <br />11. Comments: site is suction safe, no turbines. <br />