Laserfiche WebLink
4411212012 12:42 i209) 465-4922 Wayne Henderson <br />D. Results of Testing/Servicing <br />Software Version Installed: <br />Page 315 <br />uompiete <br />the tonowin <br />cnecKnst: <br />® Yes <br />❑ No* <br />is the audible alarm operational? <br />® Yes <br />❑ No* <br />is the visual alarm operational? <br />® Yes <br />❑ No* <br />Were all sensors visually Inspected, functionally tested, and confirmed operational? <br />® Yes <br />❑ No* <br />Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their proper <br />operation? <br />❑ Yes <br />❑ No* <br />if alarms are relayed to a remote monitoring station, is all communications equipment (e.g., modem) operational? <br />® N/A <br />❑ Yes <br />❑ No* <br />For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak, <br />® N/A <br />fails to operate, or Is electrically disconnected? If yes: which sensors initiate positive shut -down? (Check all that apph/) ❑ SumplTrench <br />Sensors: ❑ Dispenser Containment Sensors. <br />Did you confirm positive shut -down due to teaks and sensor failureldisconnection? ® Yes; ❑ No. <br />❑ Yes <br />❑ No* <br />For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e., no mechanical overfill prevention valve is <br />® N/A <br />installed), is the overfill warning alarm visible and audible at the tank fill point(s) and operating properly? If so, at what percent of tank capacity <br />does the alarm trigger? % <br />❑ Yes <br />® No <br />Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced and list the manufacturer name <br />and model for all replacement parts in Section E. below. <br />®yes* <br />❑ No <br />Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br />❑ Product; [a Water, if yes, describe causes in Section E, below. <br />® Yes <br />❑ No* <br />Was monitoring system set-up reviewed to ensure proper settings? Attach set up reports, if applicable <br />® Yes <br />❑ No* <br />is all monitoring equipment operational per manufacturers specifications? <br />* In Section E below, describe how and when these deficiencies were or will be corrected. <br />ABOUT .I 1/2 GALLONS OF WATER IN DIESEL SUMP. REMOVED AND PUT INTO ON <br />E. comments: SITE CONTAINMENT. <br />Monitoring System Certification Page 2 of 4 212 U07 <br />