Laserfiche WebLink
04/1212012 12:42 i2091465-442vO Wayne Henderson Page 315 <br />F. In -Tank Gauging 1 SIR Equipment. ® Check this box it tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />❑ Yes <br />❑ <br />No' <br />Has all input wiring been Inspected for proper entry and termination, including testing for ground faults? <br />❑ Yes <br />❑ <br />No. <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ Yes <br />❑ <br />No' <br />Was accuracy of system product level readings tested? <br />❑ Yes <br />❑ <br />No' <br />Was accuracy of system water level readings tested? <br />❑ Yes <br />❑ <br />No, <br />Were all probes reinstalled property? <br />❑ Yes <br />❑ <br />No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />-in oaCUOn r/, uelow, Heicrlue riow apu when (nese uen{8e0ulei wale VI will Ke is Vl le4a<V. <br />Line Leak Detectors (LLD): ® Check this box 4 LLDs are not installed. <br />Complete the foilowina checklist: <br />❑ Yes <br />❑ <br />No' <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? (Check all the: apply) <br />❑ <br />NIA <br />Simulated leak rate: ❑ 3 g.p.h.; ❑ 0.1 g.p.h; ❑ 0.2 g.p.h. <br />❑ Yes <br />❑ <br />No' <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />❑ Yes <br />❑ <br />No' <br />Was the testing apparatus properly calibrated? <br />❑ Yes <br />❑ <br />No' <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ <br />N/A <br />❑ Yes <br />❑ <br />No" <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />❑ <br />NIA <br />❑ Yes <br />❑ <br />No- <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br />❑ <br />NIA <br />❑ Yes <br />❑ <br />No" <br />For electronic LLDs. does the turbine automatically shut off if any portion of the monitoring system malfunctions or faits a test? <br />❑ <br />NIA <br />❑ Yes <br />❑ <br />No' <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />❑ <br />NIA <br />❑ Yes <br />❑ <br />No` <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />- in ciection n, oalow, oescnoe now ana when tnese oenumouiva were ul wnl ue can V.— <br />H. Comments: SUCTION <br />Monitoring System Certification Page 3 of 4 2121101 <br />