Laserfiche WebLink
D. Results of Testing/Servicing <br /> Software Version Installed: <br /> Complete the following checklist: <br /> Yes I ❑ No* Is the audible alarm operational? <br /> Yes E3No* Is the visual alarm o erational? <br /> Yes ❑ No* Were all sensors visually inspected, functionally tested,and confirmed operational? <br /> Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> ❑ Yes ❑ No* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br /> N/A operational? <br /> Yes ❑ No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> ❑ N/A monitoring system detects a leak, fails to operate, or is electrically disco ected? If yes: which sensors initiate <br /> positive shut-down? (Check all that apply) Sump/Trench Sensors; XkDispernBser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? Yes; ❑No. <br /> ❑ Yes ❑ No* For tank systems that utilize the monitoring system as the primary tank ovei4ff warning device (i.e. no <br /> N/A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> Lip - fill point(s)and operating If so,at what percent of tank ca acity does the alarm trigger? <br /> ❑ Yes* No Was any monitoring equipment replaced? If yes, identify specific sensors,probes,or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E,below. <br /> ❑ Yes* No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) ❑ <br /> Product; ❑Water. If yes,describe causes in Section E,below. <br /> Yes No Was monitoringsystem set-upreviewed to ensure proper settings?Attach set u reports,if applicable <br /> Yes !L3No* Is all monit)ring equipment oerational per manufacturer's specifications? <br /> *In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Cct:u�ments: <br /> Page 2 of 3 03/01 <br />