Laserfiche WebLink
F. In-Tank Gauging/SIR Equ*lent: Of Check this box if tank gauging is used only for inventory control. <br /> U Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the folio in checklist: <br /> 5 Yes 7 Ll No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> U Yes U No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> U Yes _5-No* Was accuracy of system product level readings tested? <br /> U Yes 5-No* Was accuracy of system water level readings tested? <br /> HL Ll Yes U No* Were all probes reinstalled properly? <br /> I Eg�Ew <br /> 3. Yes Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): U Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> Yes E3 No* For equipment start-up or annual equipment rtification, was a leak simulated to verify LLD performance? <br /> U N/A (Check all that apply) Simulated leak rate: V3 g.p.h.; LJ 0.1 g.p.h; Ll 0.2 g.p.h. <br /> Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Yes U No* Was the testing apparatus properly calibrated? <br /> IR Yes Ll No For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> U N/A <br /> U Yes Ll No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> N <br /> �N <br /> U Yes U No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> 0 <br /> 'AA <br /> 0 <br /> N/A or disconnected? 'led <br /> s <br /> Ll Yes 14 No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> N/A or fails a test? <br /> 0* <br /> U Yes No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ELN/A <br /> 0 <br /> N Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 <br /> Page 03101 <br />