Laserfiche WebLink
9 a <br /> an <br /> SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DEPARTMENT <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-JPaLe I of 2) <br /> TYPE OF ACTION 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION 490-1 <br /> PLAN TYPE 1.MONITORING IS IDENTICAL FOR ALL UST.AT THIS FACILITY. 490-2 <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S)- <br /> 1. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) - - 1 <br /> BUSINESS NAME(Same as FACILITY NAME)QLM STOP MARKET#152 3. <br /> BUSINESS SITE ADDRESS 1721-1 SOUTH CHEROKEE LANE 103- CITY LODI,CA 95240 104. <br /> H.EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> 23 CCR12632,2634,2638,264 _-_- 490-30- <br /> MONITORING EQUIPMENT IS SERVICED 1.ANNUALLY ❑ 99.OTHER(Specify): _ <br /> ---� 490-3b <br /> III.MONITORING LOCATIONS <br /> ❑1.NEW SITE PLOT PLANIMAP SUBMITTED WITH THIS PLAN. NK.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)4%4 <br /> IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br /> 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: ea.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM 490-6 <br /> - - ---- ------ -_- --- -_ ___ __--.---- - -_ - <br /> _PANEL MANUFACTURER: GILBARCO_ _ _ _ 490-7. ! MODEL#: EMC_ _ 490$ <br /> LEAK SENSOR MANUFACTURER: GILBARCO - -- 490-9' MODEL#(S): 0794390-409 -� 490-10 <br /> 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).(23 CCR§2643) 490-11 <br /> PANEL MANUFACTURER: 490-12. MODEL M - -- 490-13 <br /> _ <br /> IN-TANK PROBE T <br /> _MANUFAC_URER: 0-90-10-. _M_ODEL#(S): 490,45 <br /> - -LEAK TEST FREQUENCY: ❑ a.CONTINUOUS -- - ❑ b.DAILY/NIGHTLY - ❑ c.WEEKLY 490-6 <br /> ___ ____ ❑_ d.MONTHLY _ ❑ e.OTHER(Specify_)_: 490-17 <br /> PROGRAMMED TESTS:- -❑ a.0.1 h. - ❑ b.0.2 h. _ _❑ c.OTHER(Specify): - - 490-18 <br /> g.p.h. g.p.h. ( P fY)� 490.19 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 490-20 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: ❑ a.36 HOURS F-1 b.60 HOURS 49122 <br /> 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 490-23 <br /> TEST FREQUENCY: ❑ a.ANNUALLY C1 b.BIENNIALLY ❑ c.OTHER(Specify): 490-25 <br /> 490-26 <br /> ❑99.OTHER (Specify): 490-27 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 490-28 <br /> VISUAL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS: DRY ❑b.LIQUID FILLED ❑c.PRESSURIZED ❑d.UNDER VACUUM - -_--� 490-29 <br /> . <br /> _PANEL MANUFACTURER: GILBARC_O_-_- -- -_-_ --490-30 MODEL#: EMC 490-31 <br /> LEAK SENSOR MANUFACTURER: GILBARCO--- - _-_- 4'!132JMODEL#(S): 0794380-208 490-33 <br /> _ __- _ - -- --__ 0-90-30- <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ,-.y,,/ra.YES ❑b.NO <br /> FAILUREMISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. 2 a.YES ❑b.NO 490-35 <br /> 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 gp.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK_IS DETECTED(23 CCR___12636)- _ _ --- 490-36 <br /> MLLD MANUFACTURER(S):VAPORLESS MFG 490-37 MODEL#(S): 99LD2000490-38 <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p_h.LEAK TESTS (23 CCR§2636) 490-39 <br /> ELLD MANUFACTURER(S) 490-40' __4MODEL#(S): -- - 41 <br /> 90-42 <br /> PROGRAMMED IN LINE LEAK TEST: ❑ 1.MINIMUM MONTHLY 0.2 g.p.h. ❑ 2.MINIMUM ANNUAL 0.1 g.p.h. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 490.43 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 490.44 <br /> 4.PIPE INTEGRITY TESTING 49o-4s <br /> TEST FREQUENCY ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHERS 1 49046490-47 <br /> 5.VISUAL PIPE MONITORING. 490-4 <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ❑C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED" 490.4 <br /> "Allowed for M2E of udwied onmimcy sampaor fuel ''&o HSC 25281. 3 <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR§2636(ax3)]. 490-50 <br /> 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 490-51 <br /> 490-52 <br /> ❑ 99.OTHER(Specify) 490.53 <br /> UPCF UST-D(12!2007)1/4 <br />