Laserfiche WebLink
0 0 <br /> SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DEPARTMENT <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Page 2 of 2) <br /> VI.UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> 1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490-54a <br /> 490-546 <br /> ❑ 1.CONTINUOUS ELECTRONIC MONITORING Ld 2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE <br /> ❑4.NO DISPENSERS ❑99.OTHER <br /> PANEL MANUFACTURER: —� ago 55 MODEL#: _ 4��' <br /> LSENSOR MANUFACTURER: �— _ — �— 490 MODEL#(S): 490-58 <br /> EAK <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑ a.YESE b�.NO 490'59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN [I a.YES I�/7 .NO 490-60- <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ aa.YES 9K. <br /> b.NO 49"1 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. Le a.YES ❑b.NO 490-62 <br /> 2.UDC CONSTRUCTION IS UK SINGLE-WALLED 112.DOUBLE-WALLED 490 <br /> -63 <br /> IF DOUBLE WALLED: 49"a <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: ❑hLIQUID ❑2.PRESSURE ❑3.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑a.YES ❑b.NO ago-"b <br /> VII.PERIODIC SYSTEM TESTING <br /> ❑ 1. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-65. <br /> DET TIN MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED.(23 CCR§2644.1)---- <br /> W:.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 490-66 <br /> 3.SPILL BUCKETS ARE TESTED ANNUALLY. _ -- — 440-6 <br /> VIII.RECORDKEEPING <br /> TThhgg following monitoring/maaigtenance records are kept for this facility: <br /> ['Alarm logs 4w68& ["Visual Inspection Records 490.686 ❑Tank integrity testing results 490-6sc <br /> ❑SIR testing results(and supporting documentation records). 490-ad ❑ Tank gauging results(and supporting documentation records). 490-680 <br /> ❑ATG Testing results(and supporting documentation records).4go-68f ❑ Corrosion Protection 60-day logs 490-6sg <br /> (Equipment maintenance and calibration records. 490-686 <br /> IX,TRAINING <br /> Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties. 490-69a <br /> REFEP,ENCE DOCUMENTS MAINTAINED AT FACILITI((Check all that apply) <br /> [�j' HIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)490-69b <br /> (OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)490.6% <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-6% <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 4go-69e <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"ago-69f <br /> ❑JSWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"4go-69s <br /> Er OTHER(Specify):max m6% -Written Procedures&Best Management Practices for Monitoring Double Containment UST System" <br /> _ffThis facility has a"Designated UST Operator'who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> The"Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> Operation of the UST system in a manner consistent with the facility's best management practices <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in chis UST Monitoring Plan <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> ➢ Names of contact person(s)for emergencies and monitoring alarm.490.70 <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan.4go-7t <br /> OVERFILL PREVENTION(OR PROTECTION)IS ACCOMPLISHED BY THE FOLLOWING TWO(2)METHODS: <br /> 1. MECHANICAL OVERFILL VALVES INSTALLED IN DROP TUBES 4 <br /> 2. SERVICE PENETRATIONS TO THE PRIMARY CONTAINMENT ARE CONTAINED WITHIN SUMPS,INCLUDING FILL&VAPOR RETURN. <br /> XI.PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that:1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The following person(s)are responsible for performing the monitoring and equipment maintenance: <br /> NAME HARBHAJAN&DEVINDER SHERGILL ago-n TITLE FRANCHISEES 490-73 <br /> NAME SAMIALKOUSSA 490-74 TITLE DISTRICT ADVISOR 490-75 <br /> The Designated Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator,and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XII.OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:i certify that the info ion providSd herein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGNATURE 49076 DATE: 490-77 <br /> AUGUST 29,2008 <br /> E <br /> APPLICANT NAME(print): 490-78APPLICANT TITLE: 490-79 <br /> MIKE KARVELOT , DIRECTOR OF ENVIRONMENTAL AFFAIRS <br /> UPCF UST-D(12/2007)3/4 <br />