My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2017-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINDBERGH
>
5000
>
2300 - Underground Storage Tank Program
>
PR0232417
>
COMPLIANCE INFO_2017-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2022 9:31:32 AM
Creation date
6/23/2020 6:55:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2017-2018
RECORD_ID
PR0232417
PE
2361
FACILITY_ID
FA0003676
FACILITY_NAME
GRUPE COMMERCIAL COMPANY HANGER #2
STREET_NUMBER
5000
Direction
S
STREET_NAME
LINDBERGH
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
01
SITE_LOCATION
5000 S LINDBERGH ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232417_5000 S LINDBERGH_2017-2018.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer Industry Standard Professional Engineer <br /> Fl Other(Spec) <br /> Test Method Used: X Pressure i Vacuum Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used: Pressure Gauges in PsilNitrogen Equipment Resolution: 1/10-15 Psi <br /> Piping Run#1 Piping Run# Piping Run# Piping Run# <br /> Piping Material: Fiberglass <br /> Piping Manufacturer: Smith <br /> Piping Diameter: 3" <br /> Length of Piping Run: Approx. 15' <br /> Product Stored: Jet A <br /> Method and location of Test boot at <br /> piping-run isolation: Piping Sum <br /> Wait time between applying 5 Minutes <br /> pressure and starting test: <br /> Test Start Time: 9:20 <br /> Initial Reading(RI): 3 Psi <br /> Test End Time: 10:20 <br /> Final Reading(RF): 3 Psi <br /> Test Duration: 1 Hour <br /> Change in Reading(RF-Ri): 0 Psi <br /> Pass/Fail Threshold or No Loss in Psi <br /> Criteria: <br /> Test Result: Pass <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> FMM <br /> am= -ftwof Emma mmw- <br /> 1!E- 1 4 2017 <br /> HENIH <br /> DEPARTMENT <br />
The URL can be used to link to this page
Your browser does not support the video tag.