Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer Industry Standard Professional Engineer <br /> Fl Other(Spec) <br /> Test Method Used: X Pressure i Vacuum Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used: Pressure Gauges in PsilNitrogen Equipment Resolution: 1/10-15 Psi <br /> Piping Run#1 Piping Run# Piping Run# Piping Run# <br /> Piping Material: Fiberglass <br /> Piping Manufacturer: Smith <br /> Piping Diameter: 3" <br /> Length of Piping Run: Approx. 15' <br /> Product Stored: Jet A <br /> Method and location of Test boot at <br /> piping-run isolation: Piping Sum <br /> Wait time between applying 5 Minutes <br /> pressure and starting test: <br /> Test Start Time: 9:20 <br /> Initial Reading(RI): 3 Psi <br /> Test End Time: 10:20 <br /> Final Reading(RF): 3 Psi <br /> Test Duration: 1 Hour <br /> Change in Reading(RF-Ri): 0 Psi <br /> Pass/Fail Threshold or No Loss in Psi <br /> Criteria: <br /> Test Result: Pass <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> FMM <br /> am= -ftwof Emma mmw- <br /> 1!E- 1 4 2017 <br /> HENIH <br /> DEPARTMENT <br />