Laserfiche WebLink
D. Results of Testing/Servicing <br /> Software Version Installed: <br /> Complete the follow! checklist: <br /> X Yes n No* is the audible alarm operational? <br /> X Yes n No* Is the visual alarm operational? <br /> X Yes r, No* Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> X Yes 0 No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their <br /> proper operation? <br /> Yes 0 No* If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.modem)operational? <br /> X WA <br /> X Yes L No' For pressurized piping systems, does the turbine automatically shut down I the piping secondary containment monitoring system <br /> N/A detects a leak,fails to operate,or Is electrically disconnected? if yes:which sensors initiate positive shut-down? (Check all that apply) <br /> 0 Sump french Sensors; 0 Dispenser Containment Sensors. Did you confirm positive shut-down due to leaks and sensor <br /> failure/disconnection? u Yes; D No. <br /> Yes Lj No* For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.no mechanical overfill prevention <br /> X N/A valve is installed),is the overfill warning alarm visible and audible at the tank fill point(s)and operating properly? If so,at what percent <br /> of tank capacity does the alm!gWr? 95 % <br /> I] Yes* No Was any monitoring equipment replaced9 If yes, identify specific sensors, probes, or other equipment replaced and list the <br /> X manufacturer name and model for all replacement its In Section E,below. <br /> Yes* No Was liquid found Inside any secondary containment systems designed as dry systems? (Check all that apply)0 Product; Lj Water. If <br /> X s,describe causes in Section E,below. <br /> 0 No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,I applicable <br /> X Yes <br /> X Yes 0 No* Is all monitoring equipment operational per manufacturers specifications? <br /> In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> Monitoring System Certification Page 2 of 4 12107 <br /> 2 2/21/07 <br />