My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2017-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINDBERGH
>
5000
>
2300 - Underground Storage Tank Program
>
PR0232417
>
COMPLIANCE INFO_2017-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2022 9:31:32 AM
Creation date
6/23/2020 6:55:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2017-2018
RECORD_ID
PR0232417
PE
2361
FACILITY_ID
FA0003676
FACILITY_NAME
GRUPE COMMERCIAL COMPANY HANGER #2
STREET_NUMBER
5000
Direction
S
STREET_NAME
LINDBERGH
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
01
SITE_LOCATION
5000 S LINDBERGH ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232417_5000 S LINDBERGH_2017-2018.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. In-Tank Gauging/SIR Equipment: X Check this box if tank gauging is used only for Inventory control. <br /> r Check this box if no tank gauging or SIR equipment Is Installed. <br /> This section must be completed If In-tank gauging equipment Is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> X Yes ❑ No* Has all Input wiring been Inspected for proper entry and termination,Including testing for ground faults? <br /> Yes ❑ No* Were all tank gauging probes visually Inspected for damage and residue buildup? <br /> Yes Li No* Was accuracy of system product level readings tested? <br /> Yes L! No* Was accuracy of system water level readings tested? <br /> Yes ❑ No* Were all probes reinstalled properly? <br /> X Yes ❑ No' Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): (X)Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> Yes ❑ N For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance?(Check all <br /> n NIA that apply) Simulated leak rate: ❑3 g.p.h.; ❑0.1 g.p.h; ❑0.2 g.p.h. <br /> Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Yes ❑ No* Was the testing apparatus properly calibrated? <br /> Yes ❑ No* For mechanical LLDs,does the LLD restrict product flow If it detects a leak? <br /> ❑ N/A <br /> ❑ Yes n No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> N/A <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system Is disabled or <br /> N/A disconnected? <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br /> N/A falls a test? <br /> R Yes ❑ No* For electronic LLDs,have all accessible wiring connections been visually Inspected? <br /> Yes ❑ No* Were all Items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Monitoring System Certification Page 3 of 4 12107 <br /> 3 2/21/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.