My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1999-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
2512
>
2300 - Underground Storage Tank Program
>
PR0232418
>
COMPLIANCE INFO_1999-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 2:05:39 PM
Creation date
6/23/2020 6:55:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999-2008
RECORD_ID
PR0232418
PE
2361
FACILITY_ID
FA0004064
FACILITY_NAME
WATERLOO LIQUOR
STREET_NUMBER
2512
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
14128102
CURRENT_STATUS
01
SITE_LOCATION
2512 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232418_2512 E WATERLOO_1999-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
324
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Was sdnsot removed for testing? es UNo U NA jj+e& UNo U NA 14yes UNo U NA rye& U No�NA <br />Was pmpeTY am'd andr j <br />Yes U No U NA <br />verified fuacrioaal Ai%s testin ? Joe$ UNo U NA Yes UNo U NA I IUYes UNo U <br />Comment i — (include #rformation on repairs mode prior ro testing'mrd mc+vnunerrded�ollorr-upor ailed testy) <br />If the entire depth of the sump is not tested, specify how much was tested. If the answer to iu of the questions indicated with an <br />asterisk (•) is "NO" or "NA"° the entire sump must be tested. (See SWRCB LG -160) <br />MCB, January 2002 <br />Page q of 7 <br />6. PIPING SUMP TESTING <br />Teat Method Developed By: <br />U Sump Manufacturer U Industry Standard Professional Engineer <br />U Other (Specify) <br />Test Method Used: <br />U PrMure <br />U Vacuum <br />'t3ydrostatic <br />Test Egttipmertt Used: Gc die i l Le�t, G�C <br />(r iY <br />F.c ip Reso)trtiI o <br />IN <br />I'm i illrsumzp <br />Suanp"# L <br />Sump # 2,,,.. <br />Sump nnrp # <br />p Diameter: <br />�Z�l <br />y� u <br />z „ <br />D <br />MateriaL•_r` <br />iac.v, - <br />A. /u <br />Height from Tank Top to Top of <br />Highest ' in Penetration:'` <br />/ r� <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />/ � r t <br />� ' ` <br />12, <br />Condition ®f sump prior to te*tin : <br />-p ,- <br />jJ,, <br />✓ <br />Portion of Sump Tested' <br />Vj24 --y L;,U y -V) <br />e✓G Z3 e <br />cr ori' s r <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />° <br />UNo U NA <br />r <br />es U No U NA <br />res U No U NAU Y <br />U No U NA <br />roduct and water <br />. <br />Turbibe shutdown response time <br />7- j:-� <br />Is system programmed for fait safe <br />I wryes U No U NA <br />shtrWawa?° <br />es UNo U NA <br />Yes U No UNA U Y U No U NA <br />Was a verified W be <br />�AYes U Nis U NA <br />o ?°AtoU <br />No U NACex <br />U No .0 NA U U No U NA <br />Wait time between ying <br />pressure/va ter d starring <br />test: <br />�+ :�i/.�• �� <br />/� /?� .�rS <br />�D ..f' <br />Test start Time: <br />_` <br />�! ..' <br />3.,35 <br />Initial Reading (R�: <br />Test End T,u a; <br />!'Q A z.5 <br />�,� As5 <br />Ra, <br />Final "� <br />R` i wi4GlkG/ <br />Telt Duratitnn: <br />3,0 ko.s0"Ce, f3' <br />Ch ngc in Readm3 <br />�lQ �sL< a. -a•- <br />Pass/Faff Threshold or Criteria: <br />. d D5 JJy2s� <br />, .v DS 13* a <br />Was sdnsot removed for testing? es UNo U NA jj+e& UNo U NA 14yes UNo U NA rye& U No�NA <br />Was pmpeTY am'd andr j <br />Yes U No U NA <br />verified fuacrioaal Ai%s testin ? Joe$ UNo U NA Yes UNo U NA I IUYes UNo U <br />Comment i — (include #rformation on repairs mode prior ro testing'mrd mc+vnunerrded�ollorr-upor ailed testy) <br />If the entire depth of the sump is not tested, specify how much was tested. If the answer to iu of the questions indicated with an <br />asterisk (•) is "NO" or "NA"° the entire sump must be tested. (See SWRCB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.