Laserfiche WebLink
SWRCB January 2002 Page Sof <br />7, UNDER -DISPENSER CONTAINMENT UDQ TESTING <br />Test Method Developed By: LAW Manufacturer U Industry Standard *rofessional Engineer <br />U Other (Spec) <br />Test Method Used: U Pressure U Vacuum Hydrostatic <br />U Other (bpeci ) <br />Test Equipment Used: Get l l uia/ Equipment Resolution:. oo S 30 n� <br />UDC #. �L UDC # 3 UDC # UDC # <br />UDC Manufacturer: e�« I Ca,.1 e . �_ _ J. . -tl i— / - 1-- .t_ <br />VLII. ir: <br />Height from UDC Bottom to Top _ <br />2fflft,hest Piping Penetration: 54m_ z <br />Height from UDC Bottom to <br />Lowest Electrical Penetration:y <br />Condition of UDC prior to <br />tesd : -0 V1 <br />rumor or uUt; rested' <br />WPI u. Le,4t, 77 dt <br />w i <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />x es <br />U No U NA <br />U No U NA U o U NA U Yes UNo U NA <br />.product and water ?' <br />,Yes <br />Turbine shutdown response time <br />y e .. <br />- y , .. c , <br />Is system programmed for fail- <br />4'Yes <br />U No U NA <br />safe shutdown?* <br />\ <br />,t�J'Yes U No U NA U es U o U NA U Yes U U NA <br />Was fail-safe verified to be <br />,Xyes <br />U No U NA <br />operational?' <br />AYes U No U NA U Yes U o U NA UY U U NA <br />Wait time between a l ' g <br />pressure/vacuum/ ter d <br />starting test <br />J^ �, <br />- . -. - .t-� <br />1^1— . ; t <br />ChanE in Readin Rr): ,rs v GL. . <br />Pass/PailThreshold or•Critjand <br />Was sensor removed for tees U No U NA es UNo U NA U es U No U U es UNo NA <br />Was sensor properly replac,Yes U No U NA <br />verifiedfunctional after tesAyes UNo U NA Yes UNo U I Yes UNo U <br />C0111ments — tnctude information on reairs made prior to testing and recommended oltow-u or ailed tests <br />4-t <br />� ff the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />