My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
2512
>
2300 - Underground Storage Tank Program
>
PR0232418
>
COMPLIANCE INFO_2009-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 2:12:54 PM
Creation date
6/23/2020 6:55:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2010
RECORD_ID
PR0232418
PE
2361
FACILITY_ID
FA0004064
FACILITY_NAME
WATERLOO LIQUOR
STREET_NUMBER
2512
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
14128102
CURRENT_STATUS
01
SITE_LOCATION
2512 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232418_2512 E WATERLOO_2009-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
313
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
From: Franzen -Hill Inc. To: 12094683433 Page: 4/6 <br />D. Results of TestinglServicing <br />Software Version Installed: <br />I'^mnlata tha $nrfn inn nharrrnct- <br />Date: 7/14/2010 4:04:28 PM <br />E Yes <br />ID No* <br />Is the audible alarm operational? <br />Yes <br />E No* <br />is the visual alarm operational? <br />Le Yes <br />E No* <br />Were all sensors visually inspected, functionally tested, and confirmed operational? <br />Yes <br />E No* <br />Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their <br />proper o ration? <br />E Yes <br />No* <br />If alarms are relayed to a remote monitoring station, Is all communications equipment (e.g. modem) operational? <br />NIA <br />Yes <br />E No* <br />For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment monitoring <br />E NIA <br />system <br />detects a teak, fails to operate, or is electrically disconnected? If yes: which sensors initiate positive shut -down? (Check all that apply) <br />E SumplTrench Sensors; E Dispenser Containment Sensors. Did you confirm positive shutdown due to leaks M sensor <br />E Yes <br />E No* <br />For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no mechanical overfill prevention <br />NIA <br />valve is installed), is the overfill warning alarm visible and audible at the tank fill point(s) and operating properly? If so, at what percent <br />of tank capac does the alarm u r? <br />E Yes* <br />No <br />Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced and list the <br />manufacturer name and model for all replacement parts in Section E, below. <br />E Yes* <br />No <br />Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) E Product•, E Water. if <br />Tj <br />es, describe causes in Section E, below. <br />Yes <br />E No* <br />Was monitoring system set-up reviewed to ensure proper settings? Attach set up reports, It applicable <br />Yes <br />E No* <br />Is all monitoring equipment operational per manufacturer's specifications? <br />in seerion c owow, aescriae now ana when inese cienetencies were or wm sae verrecrea. <br />E. Comments: <br />Avw v.A <br />Monitoring System Certification Page 2 of 4 12107 <br />2 2/21/07 <br />This fax Was sent with GFI FAXmaker fax server. For more information, visit: http://www.gfi.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.