My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
2512
>
2300 - Underground Storage Tank Program
>
PR0232418
>
COMPLIANCE INFO_2009-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 2:12:54 PM
Creation date
6/23/2020 6:55:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2010
RECORD_ID
PR0232418
PE
2361
FACILITY_ID
FA0004064
FACILITY_NAME
WATERLOO LIQUOR
STREET_NUMBER
2512
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
14128102
CURRENT_STATUS
01
SITE_LOCATION
2512 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232418_2512 E WATERLOO_2009-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
313
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
From: Franzen -Hill Inc. To: 12094683433 <br />is <br />Page: 5/6 Date: 7/14/2010 4:04:28 PM <br />46, <br />F. in Tank Gauging ! SIR Equipment: E Check this box if tank gauging is used only for inventory control. <br />E Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in4ank gauging equipment is used to perform leak detection monitoring. <br />Comnlets the following checklist: <br />Yes <br />E <br />No* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />Yes <br />E <br />No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />Yes <br />E <br />No* <br />Was accuracy of system product level readings tested? <br />Yes <br />E <br />No* <br />Was accuracy of system water level readings tested? <br />Yes <br />E <br />No* <br />Were all probes reinstalled properly? <br />Yes <br />E <br />No* <br />I Were all items on the equipment manufacturer's maintenance checklist completed? <br />. in the Section 11, Dow aescriDe now ano when these oenciencies were or wni De correctea. <br />G. Line Leak Detectors (LLD): E Check this box if LLDs are not installed. <br />Comolete the followlna checklist - <br />- in the ;section n, oerow, oescnce now ano wren there aencrencies were or wiir oe correctea. <br />H. Comments: <br />Monlioring System Certification Page 3 of 4 12107 <br />3 <br />This fax was sent with GFI FAXmaker fax server. For more information, visit: http://www.gfi.com <br />2/21/07 <br />Yes <br />E <br />No* <br />For equipment start-up or annual t certification, was a teak simulated to verify LLD performance? (Check aff <br />E <br />NIA <br />that apply) Simulated leak rat E 3 g.p. E 0.1 g.p.h ; E 0.2 g.p.h. <br />E <br />No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />less <br />E <br />No* <br />Was the testing apparatus property calibrated? <br />E <br />No* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />E <br />NIA <br />E <br />Yes <br />No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />NIA <br />E <br />Yes <br />E <br />No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />_ <br />NIA <br />or <br />E <br />Yes <br />ENo* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br />NIA <br />falls a test? <br />E <br />Yes <br />E <br />No* <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />NIA <br />Yes <br />E <br />No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />- in the ;section n, oerow, oescnce now ano wren there aencrencies were or wiir oe correctea. <br />H. Comments: <br />Monlioring System Certification Page 3 of 4 12107 <br />3 <br />This fax was sent with GFI FAXmaker fax server. For more information, visit: http://www.gfi.com <br />2/21/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.