My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
2512
>
2300 - Underground Storage Tank Program
>
PR0232418
>
COMPLIANCE INFO_2009-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 2:12:54 PM
Creation date
6/23/2020 6:55:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2010
RECORD_ID
PR0232418
PE
2361
FACILITY_ID
FA0004064
FACILITY_NAME
WATERLOO LIQUOR
STREET_NUMBER
2512
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
14128102
CURRENT_STATUS
01
SITE_LOCATION
2512 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232418_2512 E WATERLOO_2009-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
313
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br />0 0 <br />Jeff Wong [EH] <br />From: Diane Lopez [dlopez@franzenhill.com] <br />Sent: Thursday, May 20, 2010 7:09 AM <br />To: Jeff Wong [EH] <br />Cc: Richard Warren <br />Subject: RE: 2512 Waterloo EVR upgrade permit status <br />Jeff - We are in the process of getting you the details requested. <br />Diane Lopez <br />Franzen -Hill Corporation <br />1100 N. "J" St. <br />Tulare, CA 93274 <br />(559) 688-2977 ext. 3002 <br />(559) 805-3368 cell <br />(559) 688-1467 fax <br />From: Jeff Wong [EH] [mailto:Jwong@sjcehd.com] <br />Sent: Wednesday, May 19, 2010 4:30 PM <br />To: Diane Lopez <br />Cc: Richard Warren <br />Subject: RE: 2512 Waterloo EVR upgrade permit status <br />Diane and Richard: <br />Thanks for the revised plans for the service request (SR0057217). Our office (EHD) received it on May 13, 2010. 1 left a <br />message on your (Diane's) voice mail the next day on May 14, 2010 that EHD still has questions before we can approve <br />this Service Request. Since I have not heard back from you, I thought I would send you an email. <br />In order for EHD to approve this workplan, please provide the following information: <br />--Please clarify what is the "pipe" penetrating the sump (but NOT connected to the tank) drawn on Sheet 1? Is this "pipe" <br />the old vent line, or new line, or some secondary conduit where the old and/or new vent lines are pulled through to be <br />connected to the tank? Please label. <br />-- EHD had asked for the "fate of the existing vent lines to the vent" in two previous email correspondences dated April 6 <br />and May 5. 2010. The workplan stated that "existing vent lines to remain connected". Does that mean the existing vent <br />line is still connected to the exsting vent column but is cut off /capped off inside the sump, or is it cutoff outside the <br />sump? Please provide drawing of the existing vent and where it is cut off from the tank. <br />-- EHD had asked for depth of the penetration into the 91 sump. Is the above -referenced "pipe" drawn on the workplan <br />where the new vent line penetrates into the sump? If this "pipe" drawn on the workplan has nothing to do with the new vent <br />line, how is the new vent line connected to the tank? Are there new penetrations into the sump for this EVR upgrade? <br />Please draw and label how the new vent line is connected to the tank. <br />-- This work plan still has not included location of the existing fuel lines requested by EHD in the above two previous <br />emails. If this information is unknown, then secondary containment test for all fuel lines will be required. <br />Please submit the above information as soon as possible. At this point it would appear that at minimum, a secondary <br />containment test for the tank is required. Based on further information from you, a lake test for the sump and secondary <br />containment test for the fuel lines may also be required. <br />Sincerely, <br />Jeff <br />5/20/2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.