Laserfiche WebLink
Monitoring System Certification <br /> F. In-Tank Gauging f SIR Egnipment: ® Check this box if tank gauging is used only for inventory control_ <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> [I Yes ❑ No* Has all input wiring leen inspected for proper entry and termination,including testing for wound faults? <br /> ❑ Yes E] No* Were all tank gauging probes visually inspected for dwriage and residue buildup? <br /> [IYes CI No* Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No* Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No* Were all probes reinstalled properly? <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist comp. leted? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Lime Leak Detectors(LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the foliowin checklist: <br /> ❑ Yes ❑ No* For cquipment start-up or annual equipment certification, was a leak simulated to verify LLA performance? <br /> ❑ N/A (Check all that apply) Simulated leak rate: ❑3 g.p.h.; ❑0.1 g.p.h; ❑0.2 g.p.h. <br /> ❑ Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ❑ Yes ❑ No* Was the testing apparatus properly calibrated? <br /> ❑ Yes ❑ No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leaks? <br /> ❑ N/A <br /> ❑ Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> ❑ N/p, or disconnected? <br /> Cl Yes ❑ No* For electronic LLDs,docs the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> ❑ N/A or fails a test? <br /> ❑ Yes ❑ No'" For electronic LLl7s,have all accessible wiring connections been visually inspected? <br /> ❑ N'/A <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> U. Comments: <br /> Page 3 of 3 <br />