Laserfiche WebLink
Monitoring System Certification <br /> D. Results of Testing/Servicing <br /> Software Version Installed- <br /> Complete <br /> nstalled:Com tete the following checklist: <br /> ® Yes ❑ No's Is the audible alarm operational? <br /> 0 Yes ❑ No* Is the visual alarm operational? <br /> ® Yes ❑ No* Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> ® Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> ❑ Yes ❑ No* If alarms are relayed to a rermte monitoring station, is all communications equipment (e.g., modern) <br /> C9 N/A operational? <br /> ® <br /> yes <br /> ❑ No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> ® N/A monitoring system detects a leak, fails to operate,or is electrically disconnected? If yes:which sensors initiate <br /> positive shut-down? (Check all that apply) 8 Sump/Trench Sensors; 0 Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? ®Yes; ❑No. <br /> ❑ Yes ❑ No* For tank systems that utilize the ruonitoring system as the primary tank overfill warning device (i.e., no <br /> ® N/A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fill point(s)and operating properly? If so,at what percent of tank capacity does the alarm trigger? 90% <br /> C@ Yes* ❑ No Was any monitoring equipment replaced? If yes,identify specific sensors,probes,or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E,below. <br /> ❑ Yes* ® No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> ❑Product; ❑Water. If yes,describe causes in Section E,below. <br /> Yes ❑ I`1o* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> ® Xes ❑ No* Is all monitoring equipment operational per manufacturer's specifications? <br /> *.In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Commeatc REPLACE OLD TANK MONITOR WITH INCON TS-550,TEST SENSORS,FAIL SAFE,POSTIVE <br /> SHUT OFF. <br /> Page 2 of 3 <br />