My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
2512
>
2300 - Underground Storage Tank Program
>
PR0232418
>
COMPLIANCE INFO_2009-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 2:12:54 PM
Creation date
6/23/2020 6:55:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2010
RECORD_ID
PR0232418
PE
2361
FACILITY_ID
FA0004064
FACILITY_NAME
WATERLOO LIQUOR
STREET_NUMBER
2512
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
14128102
CURRENT_STATUS
01
SITE_LOCATION
2512 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232418_2512 E WATERLOO_2009-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
313
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UST SYSTEM RETROFIT OR REPAIR <br />(Submit minimum of 3 sets of plans & applications as originals will be retained by EHD) <br />1. Site map enclosed? YES ( ] NO [I <br />2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training"Ste certificates <br />and Safety <br />person installing or testing any component that Is reired or re aced. Ensure a copy <br />Plan" is available on the jobsits as required by Title 8. <br />d and <br />ch a <br />ram <br />3. Detailed description tiro re airs and/orbe ed. replacements, components <br />if repairing a component, daired or escribe howathis will be done. drawn <br />to scale showing location P rade, use the UST Installation Application <br />gd in piping, UDC's, or other UST equipment, or performing tank top upgrade, <br />pages 4-8 as necessary for a timely plan review): <br />`i ce e <br />t <br />OL0 <br />4 k4 <br />4. list of equipment to be used (Attach manufacturer's specification sheets showing third -party approval): Cycc``(S <br />dl <br />V� <br />2 1201 <br />1 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.