My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
2512
>
2300 - Underground Storage Tank Program
>
PR0232418
>
COMPLIANCE INFO_2011-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 2:16:02 PM
Creation date
6/23/2020 6:55:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2018
RECORD_ID
PR0232418
PE
2361
FACILITY_ID
FA0004064
FACILITY_NAME
WATERLOO LIQUOR
STREET_NUMBER
2512
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
14128102
CURRENT_STATUS
01
SITE_LOCATION
2512 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232418_2512 E WATERLOO_2011-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
429
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OPTIONAL: Apply the Bravo <br />Clamps immediately following adhesive <br />application to each side of the pipe. <br />To Install: Tighten the clamp to the pipe <br />approximately 1" from the face of the <br />Flange and hand -tighten each thumb <br />screw so each bolt is evenly snug against <br />the fitting. Install one on each side. <br />When both clamps are snug then <br />proceed to apply a 1/4 - 1/2 turn to each <br />bolt evenly. When the bolts are applying <br />enough force against the Flange, the <br />clamp will slide along the pipe away from <br />the Flange. Evenly turn the bolts until this <br />occurs to maintain an even amount of <br />force against the face of the Flange. <br />After clamps have been installed and. <br />secured, use an adhesive brush or <br />gloved finger to bead the adhesive and <br />keep it from ' sagging or running off the <br />fitting. Spread it around as thick as <br />possible 360° around the two Critical <br />Joints (FIG. 137). Repeat or add <br />additional mixed adhesive to build up a <br />thick, heavy bead at each critical joint. <br />11 <br />CLAMP KIT CHART MODEL # <br />F -20 -FF <br />F -40 -FF Fiffing • <br />ROUND.- REQUIRED <br />IN ADD <br />- <br />.DD • • THE SET SCREWS. DO NOT <br />1 44 NN ITIT <br />.11) Glue all penetration fittings and allow the full cure time per the adhesive kit instructions. <br />.12) After adhesive has fully cured, remove the clamps by backing off the thumbscrews until they <br />disengage from any adhesive that covered them. <br />OPTIONAL: Re -apply adhesive to fill the holes the clamp -bolts left in the adhesive at the face. <br />C) TEb&%TI'NL'G'%Tff 0 U11 R. F=SEKw% I E Si I NSTALLATI'O"k N <br />After all the FF -Series Fiberglass Flange Fittings are installed and have fully cured: <br />For SingleWall: Water level test to a maximum of 2" above the highest Bravo FF -Series Fitting. <br />8 ii -FF -Series -11A <br />
The URL can be used to link to this page
Your browser does not support the video tag.