My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
2512
>
2300 - Underground Storage Tank Program
>
PR0232418
>
COMPLIANCE INFO_2011-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 2:16:02 PM
Creation date
6/23/2020 6:55:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2018
RECORD_ID
PR0232418
PE
2361
FACILITY_ID
FA0004064
FACILITY_NAME
WATERLOO LIQUOR
STREET_NUMBER
2512
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
14128102
CURRENT_STATUS
01
SITE_LOCATION
2512 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232418_2512 E WATERLOO_2011-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
429
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Anchoring the Pump/Dispenser to the Island Installing Units on the Island <br />111111 pw=§ <br />Note: Pumps do not normally require Shear Valves. The following procedure for a pump is <br />identical to that of a dispenser, except that the Shear Valve may not be used. <br />Improper anchoring of units could cause damage, severe injury, or death resulting from the <br />unit tipping over from the impact or drive -off. <br />NFPA 30A requires the anchoring of pumps/dispensers. <br />Securely install anchor bolts at all anchoring locations as shown on foundation diagrams for <br />safe operation of Shear Valves and hose breakaways. <br />To anchor pumps/dispensers to the island, proceed as follows: <br />1 Verify if the Shear Valves are firmly anchored to the island form (concrete or Pit Box). See <br />Figure 6-8. <br />Note: If the Shear Valve is not anchored properly, it may not operate correctly during a severe <br />impact. Follow the Shear Valve manufacturer's instructions. <br />Figure 6-8: Anchoring Shear Valves using Anchor Brackets <br />Page 52 MDE-3985UEncore®Installation Manual • September 2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.